least earn some income from mining on the property until it can be transformed into a<br />

LSM enterprise with foreign capital, expertise and experience. Absenteeism in the gold<br />

mining sector creates the worst of all possible worlds. The mine site becomes a free-forall,<br />

and crime rules. Miners face uncertainties and are continually at risk of injury and<br />

even death. The government should seriously consider revoking the permits of the nonactive<br />

concession holders.<br />

4.7 Brazilian migrant miners.<br />

Among Brazilian miners, the range of investment capital and mining expertise that has<br />

been mobilized varies considerably from unit owner to unit owner. At Benzdorp, there<br />

are owners who operate one or more 6 inch units with heavy equipment, maintain<br />

elaborate camps with a maintenance shop, short-wave communication equipment, a<br />

satellite TV dish and other amenities. The owner usually has one or two foremen who<br />

manage the day-to-day gold mining activities. The results for the month of November<br />

2004 Table 5 are presented for a Brazilian owner who operates two mining units with one<br />

backhoe excavator. Some equipment owners also operate a store, a restaurant or a camp<br />

for sex-workers, as well as ATV‟s to transport fuel and supplies. Not all unit owners have<br />

large en well equipped outfits. There are also poor unit owners who struggle to get by<br />

with small 4 inch outfits. The owner usually works in the pit alongside the other miners<br />

and maintains a very basic camp.<br />

Investment cost of a hydraulic mining for land mining may vary between US $ 10,000<br />

and US $ 20,000, including the cost of delivery to mine site. Inclusion of heavy<br />

equipment would add another US $ 40,000 to US $ 60,000, depending on the location of<br />

the mine site. The cost of a river dredge may vary from US $ 50,000 to US $ 200,000<br />

depending on the sophistication of the technology used.<br />

Payment to crew members varies with the level of investment and technology. A unit that<br />

works with the help of an excavator will dig, prepare, and mine a pit about twice as fast<br />

as a unit without an excavator. The cost of the mine operation, however, will be<br />

substantially higher. As a result, the crew of a 4” or 6” unit without an excavator will<br />

receive twice as much, 30% instead of 15%, of the gold production, because they will<br />

work longer to produce the same amount of gold as a unit with an excavator. The crew of<br />

a unit with excavator will produce more gold faster, but at a higher cost, and thus earn a<br />

smaller percentage of the overall gold production. The table below outlines the payment<br />

rates.<br />

The table on the next page lists the monthly results of a SSGM enterprise employing two<br />

hydraulic units at adjoining locations and one excavator in the Benzdorp area. The cost of<br />

fuel is a key factor in the cost of production. During mid-2004 the cost of fuel was 24<br />

grams of gold per barrel of 200 liters, but at the end of the year a very severe dry season<br />

resulted in an all-time low water level, making river transport impossible. Fuel had to be<br />

flown in and the price in December per barrel of diesel increased to 40 grams. The results<br />

below are for the month of November. At that time, fuel had already increased to 30<br />

grams per barrel, but the units were using fuel bought at the old price. In December,<br />