29.07.2013 Views

Best Of 2006 - McGraw Hill Construction

Best Of 2006 - McGraw Hill Construction

Best Of 2006 - McGraw Hill Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Best</strong> of <strong>2006</strong> Southern California<br />

Building the Performing Arts Center<br />

and Student Commons at the<br />

Thacher School, a four-year private<br />

school in Ojai, meant understanding<br />

the surrounding landscape and the<br />

school’s mission.<br />

The school is surrounded by peaks<br />

and valleys and emphasizes outdoor<br />

lifestyles. Academics, horsemanship<br />

and manual labor are among the skills<br />

students learn at Thacher.<br />

The Student Commons, the section<br />

of the school designed for meetings and<br />

Judges’ Comments<br />

gatherings, was designed to overlook<br />

the Ojai Valley. The roofline of the<br />

Performing Arts Center was designed<br />

to steer the viewers’ eyes toward the<br />

nearby mountains and the auditorium’s<br />

big window also has a view of nearby<br />

Twin Peaks.<br />

Design architect Barton Phelps and<br />

Associates aligned the buildings specifi-<br />

cally with the surrounding mountains<br />

of Los Padres. Harley Ellis Devereaux<br />

served as the executive architect while<br />

Matt <strong>Construction</strong> was the general contractor.<br />

An infirmary and assembly hall were<br />

removed to make way for the two larger<br />

buildings.<br />

The two buildings were constructed<br />

with a stepped courtyard in between;<br />

that area was created for student gatherings<br />

and outdoor events.<br />

The two buildings were also designed<br />

“Elegant, perfect for Ojai from a design standpoint.”<br />

to complement each other. For instance,<br />

the Commons building provides a<br />

lobby, reception area and restroom facilities<br />

which can also be used by students<br />

in the Performing Arts Center. A games<br />

room, kitchen and student store were<br />

also installed in the Commons building.<br />

A 450-seat auditorium in the arts<br />

building was designed to allow the<br />

51 California <strong>Construction</strong> 12/<strong>2006</strong><br />

Thacher School,<br />

Ojai<br />

Project Team<br />

K-12<br />

Award of Merit<br />

Owner<br />

Thacher School<br />

Design Architect<br />

Barton Phelps & Associates,<br />

Los Angeles<br />

Executive Architect<br />

Harley Ellis Devereaux, Los Angeles<br />

General Contractor<br />

Matt <strong>Construction</strong>, Santa Fe Springs<br />

Structural Engineer<br />

Kurily Szymanski Tchirkow, Inc.,<br />

Los Angeles<br />

Landscape Architect<br />

Burton & Co., Santa Monica<br />

Acoustics/Audio-Visual<br />

McKay Conant Brook, Inc.,<br />

Westlake Village<br />

Theater Consultant<br />

Landry & Bogan, Mountain View<br />

lower 300 seats to be used for daily<br />

assembly. The arts building was given<br />

metal siding to complement the rustic<br />

nature of the campus while the commons<br />

received red cedar paneling,<br />

topped with a red brick roof.<br />

The two buildings were constructed<br />

as part of an ongoing capital campaign<br />

for Thacher with a goal of raising $70<br />

million. The two buildings cost more<br />

than $17 million to build.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!