Version: 2Q05 Standard ICA<br />

07/06/05<br />

Attachment 4 - Remote Site<br />

Page 10<br />

the sets of equipment of both collocated telecommunications carriers by<br />

constructing a dedicated cable support structure between the two (2) contiguous<br />

cages. OTI shall deploy such optical or electrical cross-connections directly<br />

between its own equipment and the equipment of the other collocated<br />

telecommunications carrier without being routed through BellSouth’s equipment<br />

or, in the case of a CCXC provisioned between contiguous collocation spaces,<br />

common cable support structure. OTI shall not provision CCXC on any BellSouth<br />

distribution frame, POT Bay, DSX panel or LGX panel. OTI is solely responsible<br />

for ensuring the integrity of the signal.<br />

3.5.3 To place an order for a CCXC, OTI must submit an application to BellSouth. If<br />

no modification to the Remote Collocation Space is requested other than the<br />

placement of a CCXC, the Co-Carrier Cross-connect Application Fee for a CCXC,<br />

as defined in Exhibit B, will apply. If other modifications are requested, in addition<br />

to the placement of a CCXC, the Application Fee will apply. BellSouth will bill<br />

this nonrecurring charge on the date that it provides an Application Response to<br />

OTI.<br />

4. Occupancy<br />

4.1 Space Ready Date. BellSouth will notify OTI in writing that the Remote<br />

Collocation Space is ready for occupancy (Space Ready Date).<br />

4.2 Acceptance Walkthrough. OTI will schedule and complete an acceptance<br />

walkthrough of each Remote Collocation Space with BellSouth within fifteen (15)<br />

days after BellSouth notifies OTI that Remote Collocation Space is ready for<br />

occupancy (Space Ready Date). BellSouth will correct any deviations to OTI’s<br />

original or jointly amended requirements within seven (7) days after the<br />

walkthrough, unless the Parties jointly agree upon a different time frame, and<br />

BellSouth shall establish a new Space Ready Date. Another acceptance<br />

walkthrough will then be scheduled and conducted within fifteen (15) days after<br />

the new Space Ready Date. This follow up acceptance walkthrough will be limited<br />

to those items identified in the initial walkthrough. If OTI completes its<br />

acceptance walkthrough within the fifteen (15) day interval(s) associated with the<br />

applicable Space Ready Date, billing will begin upon the date of OTI’s acceptance<br />

of the Remote Collocation Space (Space Acceptance Date). In the event that OTI<br />

fails to complete an acceptance walkthrough within this fifteen (15) day interval,<br />

the Remote Collocation Space shall be deemed accepted by OTI on the Space<br />

Ready Date and billing will commence from that date.<br />

4.3 Early Space Acceptance. If OTI decides to occupy the Remote Collocation Space<br />

prior to the Space Ready Date, the date OTI occupies the space is deemed the<br />

Space Acceptance Date and billing will begin from that date. OTI must notify<br />

BellSouth in writing that its collocation equipment installation is complete. OTI’s<br />

collocation equipment installation is complete, which is when OTI’s equipment has<br />

been cross-connected to BellSouth’s network for the purpose of provisioning<br />

CCCS 190 of 261