09.08.2013 Views

Optical Telecommunications, Inc.

Optical Telecommunications, Inc.

Optical Telecommunications, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONTENTS<br />

Version: 2Q05 Standard ICA<br />

07/06/05<br />

Attachment 10<br />

Page 2<br />

1.0 Purpose 3<br />

2.0 Single Point of Contact 3<br />

3.0 Identifying the Problem 3<br />

3.1 Site Control 4<br />

3.2 Environmental Concerns 4<br />

4.0 The Emergency Control Center (ECC) 5<br />

5.0 Recovery Procedures 5<br />

5.1 CLEC Outage 6<br />

5.2 BellSouth Outage 6<br />

5.2.1 Loss of Central Office 6<br />

5.2.2 Loss of a Central Office with Serving Wire Center Functions 7<br />

5.2.3 Loss of a Central Office with Tandem Functions 7<br />

5.2.4 Loss of a Facility Hub 7<br />

5.3 Combined Outage (CLEC and BellSouth Equipment) 8<br />

6.0 T1 Identification Procedures 8<br />

7.0 Acronyms 8<br />

CCCS 249 of 261<br />

PAGE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!