09.08.2013 Views

Optical Telecommunications, Inc.

Optical Telecommunications, Inc.

Optical Telecommunications, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNBUNDLED NETWORK ELEMENTS-Florida<br />

CATEGORY RATE ELEMENTS<br />

Interi<br />

m<br />

Zone BCS USOC<br />

Rec<br />

Nonrecurring<br />

First Add'l<br />

NRC Disconnect<br />

First Add'l SOMEC SOMAN<br />

OSS Rates($)<br />

SOMAN SOMAN SOMAN SOMAN<br />

4W Copper Loop-Designed including manual service inquiry and facility<br />

reservation-Zone 1<br />

4W Copper Loop-Designed including manual service inquiry and facility<br />

1 UCL UCL4S 11.83 177.87 132.76 77.15 17.73<br />

reservation-Zone 2<br />

4W Copper Loop-Designed including manual service inquiry and facility<br />

2 UCL UCL4S 16.81 177.87 132.76 77.15 17.73<br />

reservation-Zone 3<br />

4W Copper Loop-Designed without manual service inquiry and facility reservation-<br />

3 UCL UCL4S 29.82 177.87 132.76 77.15 17.73<br />

Zone 1<br />

4W Copper Loop-Designed without manual service inquiry and facility reservation-<br />

1 UCL UCL4W 11.83 153.18 100.03 62.74 11.22<br />

Zone 2<br />

4W Copper Loop-Designed without manual service inquiry and facility reservation-<br />

2 UCL UCL4W 16.81 153.18 100.03 62.74 11.22<br />

Zone 3 3 UCL UCL4W 29.82 153.18 100.03 62.74 11.22<br />

CLEC to CLEC Conversion Charge without outside dispatch UCL UREWO 97.21 42.47<br />

Order Coordination for Unbundled Copper Loops (per loop) UCL<br />

UEA, UDN, UAL,<br />

UHL, UDL, NTCVG,<br />

NTCUD, USL,<br />

UCLMC 9.00 9.00<br />

Order Coordination for Specified Conversion Time (per LSR)<br />

LOOP MODIFICATION<br />

NTCD1, UEANL<br />

UAL, UHL, UCL,<br />

UEQ, ULS, UEA,<br />

OCOSL 23.02<br />

Unbundled Loop Modification, Removal of Load Coils-2W pair less than or equal<br />

UEANL, UEPSR,<br />

to 18k ft, per Unbundled Loop<br />

Unbundled Loop Modification Removal of Load Coils-4W less than or equal to 18K<br />

UEPSB ULM2L 0.00 0.00<br />

ft, per Unbundled Loop UHL, UCL, UEA<br />

UAL, UHL, UCL,<br />

UEQ, ULS, UEA,<br />

ULM4L 0.00 0.00<br />

Unbundled Loop Modification Removal of Bridged Tap Removal, per unbundled<br />

UEANL, UEPSR,<br />

loop<br />

SUB-LOOPS<br />

Sub-Loop Distribution<br />

UEPSB ULMBT 10.52 10.52<br />

Sub-Loop-Per Cross Box Location-CLEC Feeder Facility Set-Up UEANL, UEF USBSA 487.23<br />

Sub-Loop-Per Cross Box Location-Per 25 Pair Panel Set-Up UEANL, UEF USBSB 6.25<br />

Sub-Loop-Per Building Equipment Room-CLEC Feeder Facility Set-Up UEANL USBSC 169.25<br />

Sub-Loop-Per Building Equipment Room-Per 25 Pair Panel Set-Up UEANL USBSD 38.65<br />

Sub-Loop Distribution Per 2W Analog VG Loop-Zone 1 1 UEANL USBN2 6.46 60.19 21.78 47.50 5.26<br />

Sub-Loop Distribution Per 2W Analog VG Loop-Zone 2 2 UEANL USBN2 9.18 60.19 21.78 47.50 5.26<br />

Sub-Loop Distribution Per 2W Analog VG Loop-Zone 3 3 UEANL USBN2 16.29 60.19 21.78 47.50 5.26<br />

Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 9.00 9.00<br />

Sub-Loop Distribution Per 4W Analog VG Loop -Zone 1 1 UEANL USBN4 7.37 68.83 30.42 49.71 6.60<br />

Sub-Loop Distribution Per 4W Analog VG Loop -Zone 2 2 UEANL USBN4 10.47 68.83 30.42 49.71 6.60<br />

Sub-Loop Distribution Per 4W Analog VG Loop -Zone 3 3 UEANL USBN4 18.58 68.83 30.42 49.71 6.60<br />

Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 9.00 9.00<br />

Sub-Loop 2W Intrabuilding Network Cable (INC) UEANL USBR2 3.96 51.84 13.44 47.50 5.26<br />

Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 9.00 9.00<br />

Sub-Loop 4W Intrabuilding Network Cable (INC) UEANL USBR4 9.37 55.91 17.51 49.71 6.60<br />

Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEANL USBMC 9.00 9.00<br />

Loop Testing-Basic 1st Half Hour UEANL URET1 48.65 0.00<br />

Loop Testing-Basic Add'l Half Hour UEANL URETA 23.95 23.95<br />

2W Copper Unbundled Sub-Loop Distribution-Zone 1 1 UEF UCS2X 5.15 60.19 21.78 47.50 5.26<br />

2W Copper Unbundled Sub-Loop Distribution-Zone 2 2 UEF UCS2X 7.31 60.19 21.78 47.50 5.26<br />

2W Copper Unbundled Sub-Loop Distribution-Zone 3 3 UEF UCS2X 12.98 60.19 21.78 47.50 5.26<br />

Order Coordination for Unbundled Sub-Loops, per sub-loop pair UEF USBMC 9.00 9.00<br />

4W Copper Unbundled Sub-Loop Distribution-Zone 1 1 UEF UCS4X 5.36 68.83 30.42 49.71 6.60<br />

4W Copper Unbundled Sub-Loop Distribution-Zone 2 2 UEF UCS4X 7.61 68.83 30.42 49.71 6.60<br />

4W Copper Unbundled Sub-Loop Distribution-Zone 3 3 UEF UCS4X 13.51 68.83 30.42 49.71 6.60<br />

Order Coordination for Unbundled Sub-Loops, per sub-loop pair<br />

Loop Tagging Service Level 1, Unbundled Copper Loop, Non-Designed and<br />

UEF USBMC 9.00 9.00<br />

Distribution Subloops UEF, UEANL URETL 8.93 0.88<br />

RATES($)<br />

Svc<br />

Order<br />

Submitte<br />

d Elec<br />

per LSR<br />

Svc Order<br />

Submitted<br />

Manually<br />

per LSR<br />

Attachment: 2 Exh. A<br />

<strong>Inc</strong>remental<br />

Charge-<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

1st<br />

<strong>Inc</strong>remental<br />

Charge-<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Add'l<br />

<strong>Inc</strong>remental<br />

Charge-<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Disc 1st<br />

Version: 2Q05 Standard ICA 08/09/05 (New CLECs) Page 4 of 12<br />

CCCS 89 of 261<br />

<strong>Inc</strong>remental<br />

Charge-<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Disc Add'l

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!