19.08.2013 Views

Catalog ST PCS 7.1 - September 2005

Catalog ST PCS 7.1 - September 2005

Catalog ST PCS 7.1 - September 2005

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2<br />

Migration<br />

Gateway GT104CS: AS-AS bus communication<br />

TELEPERM M - <strong>PCS</strong> 7<br />

■ Overview<br />

SIMATIC <strong>PCS</strong> 7 plant sections on the Industrial Ethernet plant<br />

bus can be linked perfectly with existing TELEPERM M plant<br />

sections on the CS 275 plant bus by a combination of the<br />

<strong>PCS</strong>7/TM-OS operator system with double-channel functionality<br />

and GT104CS gateway. This combination enables the communication<br />

load to be distributed evenly over the plant bus. While the<br />

<strong>PCS</strong>7/TM-OS operator system with its double-channel functionality<br />

takes over the AS-OS communication with the automation<br />

systems on both CS 275 plant buses and Industrial Ethernet, as<br />

well as the clock synchronization for the TELEPERM M plant section,<br />

the inter-plant bus AS-AS communication is processed via<br />

the GT104CS gateway.<br />

The gateway behaves like a virtual automation system.<br />

In connection with the GT104CS gateway, the automation systems<br />

AS 488/TM, AS 235, AS 230 and AS 220 can be used on<br />

the TELEPERM M side. The gateway has a bus and node address<br />

on the TELEPERM M CS 275 plant bus, via which the cyclic<br />

data can be exchanged with as many as 32 automation systems<br />

on the SIMATIC <strong>PCS</strong> 7 Industrial Ethernet plant bus (TCP/IP<br />

protocol). The communication is configured in the participating<br />

function blocks of the TELEPERM M and SIMATIC <strong>PCS</strong> 7 automation<br />

systems and can also be performed online. Once the<br />

connection is set up, the gateway couples the configured transmission<br />

and reception blocks.<br />

12/2<br />

Siemens <strong>ST</strong> <strong>PCS</strong> <strong>7.1</strong> · <strong>September</strong> <strong>2005</strong><br />

■ Configuration<br />

At the GT104CS gateway, the bus and bus node address are to<br />

be set on the plant bus CS 275 by means of DIP switches. For<br />

communication with the SIMATIC <strong>PCS</strong> 7 automation system, the<br />

gateway requires only a few parameters (IP address). The connection<br />

between the SIMATIC <strong>PCS</strong> 7 automation systems and<br />

the gateway is configured using the SIMATIC Manager.<br />

The necessary configuration work for this is minimal. For the<br />

SIMATIC <strong>PCS</strong> 7 automation systems, function blocks for the<br />

TELEPERM M standard functions AKS, BKS, AKE and BKE are<br />

also supplied, as well as a central communications block<br />

TM_LINK.<br />

By means of the TM_LINK communications block and the<br />

GT104CS gateway, the AKS, BKS, AKE and BKE blocks of the<br />

SIMATIC <strong>PCS</strong> 7 automation systems communicate with the AKS,<br />

BKS, AKE and BKE blocks in the TELEPERM M automation systems,<br />

which are assigned by addressing. The function block<br />

TM_LINK uses the S7 system functions USEND and URECV internally<br />

for communication with the gateway.<br />

■ Selection and Ordering Data Order No.<br />

GT104CS gateway:<br />

9AE4 100-1EA00 H)<br />

■ Function<br />

for the AS-AS bus communication<br />

between TELEPERM M and<br />

The Gateway GT104CS is capable of processing the cyclic data<br />

exchange between the TELEPERM M automation systems on the<br />

plant bus CS 275 and up to 32 SIMATIC <strong>PCS</strong> 7 automation systems<br />

on the Industrial Ethernet plant bus.<br />

The CPU of a SIMATIC <strong>PCS</strong> 7 automation system can process<br />

SIMATIC <strong>PCS</strong> 7<br />

Hardware incl. memory card with<br />

gateway system software,<br />

AKS/BKS/AKE/BKE function<br />

blocks<br />

transmitted or received data of at least 10 AKS- + 10 AKE-<br />

+ 10 BKS- + 10 BKE-blocks in a 1s cycle. This corresponds to H) Subject to export regulations AL: N, ECCN: 4A994<br />

280 analog values and 1280 binary values per second in each<br />

communication direction.<br />

■ More information<br />

Siemens AG<br />

I&S IS E&C MES<br />

Phone: +49 721 595-6708<br />

Fax: +49 721 595-6383<br />

E-mail: gateway.solutions@siemens.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!