the front <strong>of</strong> the school where the metal siding and the new operable<br />
windows are complete. Major site work in the front and to the north <strong>of</strong> the<br />
school is scheduled to start shortly. The very left side <strong>of</strong> the picture shows<br />
the auditorium portion <strong>of</strong> the building, occupied at the conclusion <strong>of</strong> Phase<br />
1.<br />
This is a before picture, last November. The exterior windows<br />
and siding were underway.<br />
Next slide, please. This is the area last week. Major site work<br />
is starting in this area and will be completed by the end <strong>of</strong> the summer.<br />
Interior work. Major interior work remaining includes the items<br />
listed on this slide. The next few pictures will reflect the status <strong>of</strong> some<br />
interior work. This is a second floor science lab. This is a first floor<br />
science lab, ready for furniture. This is a before slide, from last November.<br />
Next picture. This is the same area last week with the installation <strong>of</strong><br />
appliances underway. This area is better known to us, probably, as Home<br />
Economics or Household Arts.<br />
This is one <strong>of</strong> three light wells, and it is another before slide<br />
looking from the first floor, up. The light well extends all the way to the<br />
lower level. And this is the slide this past week. All three <strong>of</strong> those light<br />
wells are actually almost totally complete.<br />
This is the library entrance. The librarian’s <strong>of</strong>fice is behind the<br />
windows on the near left <strong>of</strong> the picture. The circulation desk that is on<br />