Oldtown Mooretown - Text - Fingal County Council
Oldtown Mooretown - Text - Fingal County Council
Oldtown Mooretown - Text - Fingal County Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PAGE<br />
56<br />
OLDTOWN - MOORETOWN<br />
Local Area Plan<br />
3.4 Urban Design/Landscape Masterplan(s)<br />
Adherence to basic urban design principles in the LAP will<br />
ensure the existing and proposed resources of this area can be<br />
utilised to serve the future community. It is an objective of this<br />
LAP that developers will be required to develop an Urban<br />
Design/Landscape Masterplan for the LAP lands, or<br />
alternatively 2 Urban Design/Landscape Masterplans - one for<br />
<strong>Oldtown</strong> and one for <strong>Mooretown</strong> - following the adoption of this<br />
LAP.<br />
The Masterplan(s) shall comply with the provisions of this<br />
LAP. They will be three dimensional plans which present<br />
proposals or aspirations for the development of buildings,<br />
street blocks, public spaces, streets and landscape but which<br />
will not include the actual design of buildings. The<br />
Masterplans shall define massing, heights, and orientation of<br />
buildings, the proposed street and block structure; the<br />
suggested relationships between buildings and public spaces<br />
as well as movement routes for both vehicles and pedestrian/<br />
cyclists.<br />
The Planning Authority will consider proposals to deal with<br />
specific detailed design of character areas/buildings in terms<br />
of materials and design styles, on an incremental basis as<br />
part of each phase, subject to compliance with the overall<br />
Masterplan(s).<br />
The detailed design of the Western Distributor Link Road shall<br />
be undertaken in conjunction with the Urban Design/Landscape<br />
Masterplan(s).<br />
The Archaeological Conservation and Management Plan<br />
(Margaret Gowen & Co. Ltd, March 2010), which is a separate<br />
supporting document to this LAP, shall be referred to fully in<br />
undertaking the Masterplan(s).<br />
The Landscape element of the Masterplan(s) will in addition to<br />
addressing landscaping of the public realm and class 2 open<br />
spaces, require specific detail with regard to the landscape and<br />
open space strategy for the archaeological discoveries within<br />
the lands. Full regard shall be given to the Archaeological<br />
Conservation and Management Plan.<br />
The Masterplan(s) shall be prepared by a team of qualified and<br />
experienced urban designers and include inter alia landscape<br />
architects, archaeologists with experience in conservation<br />
plans, road engineers and water services engineers. The<br />
Masterplan(s) shall be developed in consultation with <strong>Fingal</strong><br />
<strong>County</strong> <strong>Council</strong>. The design team shall engage with <strong>Fingal</strong><br />
<strong>County</strong> <strong>Council</strong> at the earliest inception of the Masterplan(s) and<br />
shall undertake frequent team meetings with FCC throughout<br />
the design process to ensure coordination and agreement of<br />
interrelated aspects of the scheme.<br />
The Masterplan(s) shall be submitted to the planning authority<br />
for its agreement prior to the submission of any planning<br />
applications or the tabling of proposals for development. The<br />
agreed Masterplans shall be submitted as support documents<br />
to individual planning applications.<br />
Planning<br />
Department