15.10.2013 Views

Oldtown Mooretown - Text - Fingal County Council

Oldtown Mooretown - Text - Fingal County Council

Oldtown Mooretown - Text - Fingal County Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OLDTOWN - MOORETOWN<br />

Local Area Plan<br />

PAGE<br />

69<br />

l Provision of a pedestrian and cycle link along the<br />

eastern side of the R108 Naul Road from the junction with<br />

Brackenstown Road southward to the Knocksedan<br />

housing estate.<br />

Internal Road Network:<br />

l Local access roads and pedestrian/cyclist links shall be<br />

provided to open up the LAP lands to development as per<br />

plan layout.<br />

Road network improvements which shall be provided outside<br />

of plan lands:<br />

l Upgrade 3 roundabouts on Glen Ellan Road to cyclist<br />

friendly roundabouts.<br />

l Major upgrade and realignment of the junction of Glen<br />

Ellan Road with Balheary Road.<br />

l Widen Balheary Road to 4 lanes between the Glen Ellan<br />

Road and Castlegrange junctions over 300m length. This<br />

will encroach on public park area to the east.<br />

l Widen link road to 4 lanes between Castlegrange and<br />

R132 Estuary junctions.<br />

l Major capacity improvement at the R132 Estuary<br />

junction (unless previously delivered by Metro North<br />

project).<br />

Swords Western Quality Bus Corridor<br />

l Bus priority measures within <strong>Oldtown</strong> LAP area and via<br />

Glen Ellan Road to Rathbeale Road Junction.<br />

l Bus lanes over 150m length on the northern approach to<br />

the junction of Rathbeale Road and Murrough Road.<br />

A review of the traffic modelling and analysis undertaken as<br />

part of the Transport Network Study by Roughan O’Donovan<br />

shall be undertaken by the Planning Authority at the end of<br />

each phase of development. This review shall be used to assist<br />

in assessing individual TIA’s and shall ultimately feed in to the<br />

mid-term review of the LAP.<br />

A Transport Impact Assessment (TIA) shall be submitted with<br />

each application for development, unless otherwise agreed<br />

with the planning authority. <strong>Fingal</strong> <strong>County</strong> <strong>Council</strong><br />

Transportation Department shall be consulted prior to the<br />

submission of any TIA.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!