15.10.2013 Views

Oldtown Mooretown - Text - Fingal County Council

Oldtown Mooretown - Text - Fingal County Council

Oldtown Mooretown - Text - Fingal County Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PAGE<br />

64<br />

OLDTOWN - MOORETOWN<br />

Local Area Plan<br />

Section 4: Phasing and Implementation<br />

A phasing programme is set out as part of this LAP to ensure that<br />

the physical and social infrastructure required is provided in<br />

tandem with the residential development. The phasing programme<br />

indicates the number of phases proposed, the amount of residential<br />

development in each phase, and the associated physical<br />

infrastructure (such as roads, water services infrastructure) and<br />

the appropriate social facilities (such as schools, childcare and<br />

health facilities) required.<br />

The Swords Waste Water Treatment Plant will not be operational<br />

and the necessary foul drainage network improvements will not be<br />

completed before 2012, therefore any residential development<br />

within the LAP lands will be dependant on the delivery of this<br />

infrastructure. Prior to development of each phase/any application<br />

being made, written confirmation from <strong>Fingal</strong> Water Services<br />

Department will be required to state that capacity is available and<br />

extent of that capacity.<br />

Following the adoption of this LAP and prior to the receipt of any<br />

applications for development, the following shall be<br />

undertaken:<br />

Urban Design/Landscape Masterplan(s)<br />

In accordance with principles and objectives of the adopted LAP, an<br />

Urban Design/Landscape Masterplan(s), for the plan lands shall be<br />

prepared by qualified, experienced urban designers/landscape<br />

architects (see section 3.4). The urban design team shall comprise<br />

in addition suitably qualified archaeologists with experience in<br />

conservation plans, road engineers and water services engineers.<br />

The Masterplan(s) shall be developed in consultation with <strong>Fingal</strong><br />

<strong>County</strong> <strong>Council</strong>. The design team shall engage with <strong>Fingal</strong> <strong>County</strong><br />

<strong>Council</strong> at the earliest inception of the Masterplan(s) and shall undertake<br />

frequent team meetings with FCC throughout the design<br />

process to ensure coordination and agreement of interrelated<br />

aspects of the scheme.<br />

The Masterplan(s) shall be submitted to the planning authority for<br />

its agreement prior to the submission of any planning applications<br />

or the tabling of proposals for development. This shall require the<br />

co-operation between land owners and the agreed plan shall form<br />

the blue-print for the development of the plan lands. The agreed<br />

Masterplans shall be submitted as support documents to individual<br />

planning applications.<br />

Landscape and Recreational Strategy for Swords Regional Park<br />

The Landscape and Recreational Strategy for Swords Regional Park<br />

(to be prepared by FCC) shall be prepared in full prior to/in<br />

conjunction with the Urban Design/Landscape Masterplan(s) for the<br />

plan lands.<br />

E.I.S<br />

An E.I.S for the developments shall be prepared and submitted, as<br />

determined by the Planning Authority. The EIS shall be submitted<br />

with every planning application.<br />

Planning<br />

Department

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!