B.S. SPONGE PRIVATE LIMITED<br />
Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />
REIA Report for the Proposed Mini Integrated Steel Plant<br />
Chapter – 10<br />
‣ Energy meters will be installed for all the pollution control systems.<br />
‣ Rain water harvesting pits are being constructed as per the guidelines issued by<br />
CGWB.<br />
Recommendations<br />
a) The proposed air pollution control equipment will be installed prior to commissioning<br />
the expansion plant.<br />
b) Continuous monitoring system for particulate matter in the stacks will be provided.<br />
c) Pressure drop measuring system will be installed to measure the pressure drop across<br />
the bag filters.<br />
d) All the internal roads shall be asphalted to reduce the fugitive dust due to truck<br />
movement.<br />
10.2.2 WATER POLLUTION MANAGEMENT<br />
10.2.2.1 SMS, ROLLING MILL & FERRO ALLOYS<br />
Closed circuit cooling system will be provided in DRI plant, cooling of Billets, TMT bars &<br />
Ferro alloys. Hence there will not be any waste water generation from process and cooling in<br />
the steel plant.<br />
10.2.2.2 POWER PLANT<br />
Total waste water generation from the proposed 12 MW WHRB based Power plant and 36<br />
MW FBC based power plant is 367 cum/day (including sanitary waste water). The boiler<br />
blowdown & DM Plant regeneration water will be treated in a neutralization tank and after<br />
treatment it will be mixed with CT Blow down and treated service water. The treated effluent<br />
will be stored in a Central Monitoring Basin (CMB). The treated effluent will be used for<br />
onland for irrigation within the premises after ensuring compliance with CPCB/CECB<br />
standards.<br />
Total effluent generated (excluding sanitary waste water)<br />
Effluent to be used for Ash Conditioning & dust suppression<br />
Effluent to be used for greenbelt development<br />
: 367 cum/day<br />
: 75 cum/day<br />
: 292 cum/day<br />
Zero effluent discharge is being maintained in the existing plant and will be continued in the<br />
expansion also.<br />
PIONEER ENVIRO 10- 14 <strong>Environment</strong>al Impact Assessment Report<br />
Laboratories & Consultants Pvt. Ltd.