TOR COMPLIANCE<br />

S.No TERMS OF REFERENCE (ISSUED BY MoEF) Pg. No<br />

1. Present land use should be prepared based on satellite imagery.<br />

3-25<br />

Location of national parks / wildlife sanctuary / reserve forests<br />

within 10 km. radius should specifically be mentioned.<br />

2. Permission and recommendations of the State Forest Department Annexure - I<br />

regarding impact of proposed expansion on the Taraimal forest<br />

located at 1 km.<br />

3. Site-specific micro-meteorological data using temperature,<br />

3-1 to 3-2<br />

relative humidity, hourly wind speed and direction and rainfall<br />

should be collected.<br />

4. A list of industries containing name and type in 25 km radius<br />

2-4<br />

should be incorporated.<br />

5. List of raw material required, quantity and source should be<br />

2-5<br />

included.<br />

6. Design details of all the plants with manufacturing process and<br />

2-8 to2-18<br />

capacity along with quantity of final product to be manufactured<br />

should be included.<br />

7. Ambient air quality at 8 locations within the study area of 10 km., 3-5 to 3-9<br />

aerial coverage from project site with one AAQMS in downwind<br />

direction should be carried out.<br />

8. Residential colony should be located in upwind direction. Not applicable as<br />

Residential colony is<br />

not proposed<br />

9. The suspended particulate matter present in the ambient air must 3-7 to 3-9<br />

be analyzed for the presence of poly-aromatic hydrocarbons<br />

(PAH), i.e. Benzene soluble fraction. Chemical characterization<br />

of RSPM and incorporating of RSPM data.<br />

10. Impact of the transport of raw material and finished product on<br />

4-15<br />

the transport system should be assessed and provided.<br />

11. Determination of atmospheric inversion level at the project site<br />

4-7<br />

and assessment of ground level concentration of pollutants from<br />

the stack based on site-specific meteorological features.<br />

12. Plant-wise air pollution control measures proposed for the control 10-4 to 10-13<br />

of emissions from all the sources<br />

13. Control of fugitive emissions as per CPCB guidelines for DRI 10-8 to 10-13<br />

plants and secondary emissions from blast furnace, primary and<br />

secondary emissions from Sinter plant.<br />

14. One season data for gaseous emissions during winter season is 3-7 to 3-9<br />

necessary<br />

15 Data on air emissions, wastewater generation and solid waste Annexure – II<br />

management for the existing plant should be incorporated<br />

16 Point-wise compliance to the specific and general conditions<br />

stipulated in the environmental clearance for the existing plant.<br />

Not applicable as<br />

existing plant was not<br />

under purview of<br />

MoEF.