REIA Report for the Proposed Mini Integrated Steel Plant<br />
Chapter – 6<br />
6.1.3 DATA ANALYSIS<br />
All the parameters will be analysed as per IS procedures specified for those parameters.<br />
All water samples will be analysed for various parameters as per IS: 10500 with the<br />
specified procedures.<br />
The methodology adopted for monitoring & analysis of RPM & SPM is as per IS: 5182<br />
Part IV SO 2 & NO x as per IS: 5182 Part II & Part VI respectively. Samples were analysed<br />
for SO 2 using improved West-Gaeke method for air samples using a spectrophotometer at<br />
a wavelength of 560 nm.<br />
Samples were analysed for NO x using Jacob and Hocheiser modified (Na-As) method,<br />
for Air samples using a spectrophotometer at wavelength of 540 nm.<br />
RPM & SPM in ambient air are found by using Respirable Dust Sampler (RDS).<br />
6.1.4 REPORTING SCHEDULE<br />
After completion of analysis copies of all the analysis reports will be sent to the Ministry<br />
of <strong>Environment</strong> & Forests and CECB on monthly basis. A copy of the report will be<br />
maintained in the plant and will be made available to the concerned inspecting<br />
authorities.<br />
6.1.5 EMERGENCY PROCEDURES<br />
Whenever the Electro Static Precipitators fail to comply with the norms, then interlocking<br />
system will immediately cut-off the supply of raw materials. The production will be re-<br />
started after ensuring compliance with norms.<br />
6.1.6 DETAILED BUDGET & PROCUREMENT SCHEDULES<br />
The budgetary allocation for <strong>Environment</strong>al monitoring is Rs. 20 Lakhs. Online monitors<br />
will be installed prior to commissioning of the kilns proposed. A third party will be<br />
engaged to monitor all the environmental parameters as per CPCB/CECB norms.<br />
PIONEER ENVIRO 6 - 3 <strong>Environment</strong>al Impact Assessment Report<br />
Laboratories & Consultants Pvt. Ltd.