B.S. SPONGE PRIVATE LIMITED<br />
Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />
REIA Report for the Proposed Mini Integrated Steel Plant<br />
Chapter – 4<br />
As per the WHO recommendation, there is no identified risk and damage of hearing due to<br />
the noise levels (Leq = 8 hours) less than 75 dBA. Most of the international damage risk<br />
criteria for hearing loss permit (Leq = 12 hours) upto 87 dBA. Further, WHO<br />
recommendation on community noise annoyance, permits day time out door noise levels<br />
of 55 dBA. Leq and night time outdoor noise level of 45 dBA leq to meet sleep criteria<br />
i.e. Leq (24 hours) = 52.2. dBA and Ldn = 5.5 dBA.<br />
4.3.3. PREDICTION OF IMPACT ON OCCUPATIONAL HEALTH<br />
The damage risk criteria as enforced by OSHA (Occupation Safety and Health<br />
Administration) to reduce hearing loss, stipulates that noise level upto 85 dBA are<br />
acceptable for 8 hour working shift per day. Plant authorities will provide ear plugs to the<br />
employees and will be enforced to be used by the employees.<br />
4.4 PREDICTION OF IMPACTS ON LAND ENVIRONMENT<br />
90 acres of land is in the possession of the management. As there are no endangered<br />
species in the vicinity of the proposed activity, there should not be any concern for the loss<br />
of important germoplasm that needs conservation.<br />
The flue gases from the kilns will pass through Waste Heat Recovery Boiler & then<br />
through ESP to bring down the particulate emission to less than 50 mg/NM 3 and will be<br />
discharged through two nos. of combined stacks (each stack with twin flues) each of 60m<br />
height for effective dispersion of emissions into the atmosphere.<br />
To control the fugitive emissions dust extraction system and dust suppression syste m will<br />
be installed at all the possible dust emanating areas. All required pollution control systems<br />
will be installed in the proposed expansion project. Hence it will not have any impact on<br />
nearby top soil.<br />
There will not be any process waste water & cooling water blowdown from the steel plant<br />
as closed circuit cooling system is proposed in the expansion. The boiler blowdown, DM<br />
plant regeneration water from the power plant will be treated in a neutralization tank and<br />
utilized for onland for irrigation within the premises. Zero effluent discharge will be<br />
maintained after expansion also. Hence there will not be any adverse impact on land<br />
environment due to the proposed expansion project. Solid waste generated from the plant<br />
will be disposed / utilized as per the norms. Hence there will not be any adverse impact on<br />
land environment due to the proposed expansion project.<br />
PIONEER ENVIRO 4 - 14 <strong>Environment</strong>al Impact Assessment Report<br />
Laboratories & Consultants Pvt. Ltd.