bs sponge private limited - India Environment Portal
bs sponge private limited - India Environment Portal
bs sponge private limited - India Environment Portal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
B.S. SPONGE PRIVATE LIMITED<br />
Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />
REIA Report for the Proposed Mini Integrated Steel Plant<br />
Chapter – 4<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
Induction Furnace<br />
& LRF (Common<br />
Stack)<br />
(Stack # 3 & 4)<br />
Reheating Furnace<br />
(Stack # 5)<br />
AFBC Boiler<br />
(Stack # 6)<br />
EAF<br />
(Stack # 7,8)<br />
DG Set (500 KVA)<br />
(Stack # 9)<br />
1.0 30 100 15.0 0.5 --- ---<br />
1.0 45 180 15.0 0.4 0.8 2.3<br />
3.0 72 180 16.0 3.8 64.6 38<br />
1.0 30 180 15.0 0.4 - -<br />
0.25<br />
7<br />
(above<br />
building)<br />
90 2.5 0.01 2.1 1.8<br />
TABLE 4.1.4<br />
NET RESULTANT MAXIMUM CONCENTRATIONS DUE TO THE<br />
PROJECT<br />
Maximum baseline conc. in the<br />
study area<br />
Maximum predicted incremental<br />
rise in concentration<br />
Incremental rise in Ground Level<br />
concentrations due to the<br />
proposed expansion of the other<br />
plants in the area<br />
Net resultant concentrations<br />
during operation of the plant<br />
National Ambient Air Quality<br />
Standards<br />
SPM (mg/m 3 ) SO 2 (mg/m 3 ) NOX (mg/m 3 )<br />
141.4 12.0 14.2<br />
0. 6 8.9 4.7<br />
3.1 18.2 8.9<br />
145.1 39.1 27.8<br />
200 80 80<br />
4.2 PREDICTION OF IMPACTS ON WATER ENVIRONMENT<br />
The proposed expansion project requires about 3700 cum/day of water. The total water<br />
requirement after the expansion will be 3800 cum/day. This includes cooling water make<br />
up for DRI, SMS, Rolling Mill, SEAF and in Power Plant Make-up water for Cooling,<br />
make-up water for Boiler, DM Plant regeneration, service water and for domestic water.<br />
The water requirement for the proposed expansion will be met from Chhuikansa Nallah /<br />
Mahanadi River. The permission for withdrawal of water will be taken before operation of<br />
the expansion project. There will not be any waste water generation from process and<br />
cooling from the existing plant. The only waste water from the existing plant will be<br />
sanitary waste water of 8 cum/day. The total effluent quantity expected from the proposed<br />
expansion will be 383 cum/day and 391 cum/day inclusive of the existing plant. Closed<br />
PIONEER ENVIRO 4 - 10 <strong>Environment</strong>al Impact Assessment Report<br />
Laboratories & Consultants Pvt. Ltd.