26.01.2014 Views

bs sponge private limited - India Environment Portal

bs sponge private limited - India Environment Portal

bs sponge private limited - India Environment Portal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B.S. SPONGE PRIVATE LIMITED<br />

Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />

REIA Report for the Proposed Mini Integrated Steel Plant<br />

Chapter – 4<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

Induction Furnace<br />

& LRF (Common<br />

Stack)<br />

(Stack # 3 & 4)<br />

Reheating Furnace<br />

(Stack # 5)<br />

AFBC Boiler<br />

(Stack # 6)<br />

EAF<br />

(Stack # 7,8)<br />

DG Set (500 KVA)<br />

(Stack # 9)<br />

1.0 30 100 15.0 0.5 --- ---<br />

1.0 45 180 15.0 0.4 0.8 2.3<br />

3.0 72 180 16.0 3.8 64.6 38<br />

1.0 30 180 15.0 0.4 - -<br />

0.25<br />

7<br />

(above<br />

building)<br />

90 2.5 0.01 2.1 1.8<br />

TABLE 4.1.4<br />

NET RESULTANT MAXIMUM CONCENTRATIONS DUE TO THE<br />

PROJECT<br />

Maximum baseline conc. in the<br />

study area<br />

Maximum predicted incremental<br />

rise in concentration<br />

Incremental rise in Ground Level<br />

concentrations due to the<br />

proposed expansion of the other<br />

plants in the area<br />

Net resultant concentrations<br />

during operation of the plant<br />

National Ambient Air Quality<br />

Standards<br />

SPM (mg/m 3 ) SO 2 (mg/m 3 ) NOX (mg/m 3 )<br />

141.4 12.0 14.2<br />

0. 6 8.9 4.7<br />

3.1 18.2 8.9<br />

145.1 39.1 27.8<br />

200 80 80<br />

4.2 PREDICTION OF IMPACTS ON WATER ENVIRONMENT<br />

The proposed expansion project requires about 3700 cum/day of water. The total water<br />

requirement after the expansion will be 3800 cum/day. This includes cooling water make<br />

up for DRI, SMS, Rolling Mill, SEAF and in Power Plant Make-up water for Cooling,<br />

make-up water for Boiler, DM Plant regeneration, service water and for domestic water.<br />

The water requirement for the proposed expansion will be met from Chhuikansa Nallah /<br />

Mahanadi River. The permission for withdrawal of water will be taken before operation of<br />

the expansion project. There will not be any waste water generation from process and<br />

cooling from the existing plant. The only waste water from the existing plant will be<br />

sanitary waste water of 8 cum/day. The total effluent quantity expected from the proposed<br />

expansion will be 383 cum/day and 391 cum/day inclusive of the existing plant. Closed<br />

PIONEER ENVIRO 4 - 10 <strong>Environment</strong>al Impact Assessment Report<br />

Laboratories & Consultants Pvt. Ltd.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!