26.01.2014 Views

bs sponge private limited - India Environment Portal

bs sponge private limited - India Environment Portal

bs sponge private limited - India Environment Portal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B.S. SPONGE PRIVATE LIMITED<br />

Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />

REIA Report for the Proposed Mini Integrated Steel Plant<br />

Chapter – 4<br />

circuit cooling system will be implemented and this will result in lower water consumption<br />

and there will not be any effluent generation from the process & cooling in the steel plant.<br />

The details of total water consumption, it's breakup and total waste water generation and<br />

it's breakup are show in Table 4.2.1. & 4.2.2. Characteristics of waste are shown in Tables<br />

4.2.3 to 4.2.6. The sanitary waste water will be treated in septic tank followed by soak pit.<br />

Rain water Harvesting structures have been constructed in the existing plant and similarly it<br />

will be continued with the help of Central Ground Water Board.. The depth of ground<br />

water table will certainly increase. Hence there will not be any adverse impact on water<br />

environment due to the proposed expansion.<br />

TABLE 4.2.1<br />

WATER REQUIREMENT FOR EXPANSION<br />

S.No SOURCE QUANTITY (cum/day)<br />

Existing Expansion Total<br />

1. Cooling water make -up for DRI Plant 90 192 282<br />

2. Cooling water make -up for SMS -- 120 120<br />

3. Cooling water make -up for Rolling mill -- 75 75<br />

4. Cooling water make-up for Ferro alloys plant -- 30 30<br />

5. For Power Plant<br />

a. Cooling Tower Make-up -- 2880 2880<br />

b. Boilers make-up -- 320 320<br />

c. D.M. plant regeneration water -- 15 15<br />

d. Service water -- 48 48<br />

6. Domestic 10 20 30<br />

Total 100 3700 3800<br />

TABLE 4.2.2<br />

WASTE WATER GENERATION FROM EXPANSION<br />

SOURCE<br />

QUANTITY (cum/day)<br />

Cooling tower blowdown 280<br />

Boilers blowdown 24<br />

DM plant regeneration 15<br />

Service water 48<br />

Sanitary waste water 24<br />

Total 391<br />

PIONEER ENVIRO 4 - 11 <strong>Environment</strong>al Impact Assessment Report<br />

Laboratories & Consultants Pvt. Ltd.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!