bs sponge private limited - India Environment Portal
bs sponge private limited - India Environment Portal
bs sponge private limited - India Environment Portal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
B.S. SPONGE PRIVATE LIMITED<br />
Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />
REIA Report for the Proposed Mini Integrated Steel Plant<br />
Chapter – 10<br />
Recommendations<br />
Plantation programme should be undertaken at several areas. They should include<br />
plantation, along the internal and external roads and along the administrative buildings<br />
and the stacking yards.<br />
People should be educated and trained in social forestry activities by local governmental<br />
and non-governmental organizations.<br />
10.2.6.1 GREEN BELT DEVELOPMENT (TOR # 24)<br />
Extensive greenbelt will be developed in addition to the existing greenbelt. The greenbelt<br />
shall be developed simultaneously with the plant construction. This will further mitigate<br />
the pollution impacts. 15 m wide greenbelt will be developed all around the plant. A<br />
detailed greenbelt plan will be developed in as per CPCB guidelines in consultation with<br />
local DFO.<br />
Greenbelt plantation<br />
Greenbelt will be developed in a set of rows of trees planted in such a way that they form<br />
an effective barrier between the plant and the surroundings. The main purpose of<br />
greenbelt development is to contribute to the following factors.<br />
• To maintain the ecological homeostatus.<br />
• To attenuate the air emissions from the kiln and the fugitive dust emissions.<br />
• To prevent the soil erosion.<br />
• To attenuate the noise levels.<br />
.Plantation of grass, flowers, bushes and trees will be taken up to reduce the generation of<br />
dust from the bare earth and to enhance the aesthetic value.<br />
Plantation species<br />
Plantation species will be considered based on the following.<br />
• Suitable to the Geo-climatic conditions of the area.<br />
• Mix of round, spreading, oblong and conical canopies.<br />
• Ever green trees.<br />
• Different heights ranging from 4m to 20m.<br />
PIONEER ENVIRO 10- 18 <strong>Environment</strong>al Impact Assessment Report<br />
Laboratories & Consultants Pvt. Ltd.