bs sponge private limited - India Environment Portal
bs sponge private limited - India Environment Portal
bs sponge private limited - India Environment Portal
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
B.S. SPONGE PRIVATE LIMITED<br />
Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />
REIA Report for the Proposed Mini Integrated Steel Plant<br />
Chapter – 6<br />
• Energy meters will be provided to all air pollution control systems to ensure<br />
effective operation of the control systems.<br />
• Fugitive emissions will be monitored and CPCB regulation in this regard will be<br />
followed.<br />
• All air pollution control systems will be taken-up for maintenance as per<br />
prescribed dates and always ensure compliance with norms.<br />
• CECB will also carry out stack monitoring and ambient air quality at regular<br />
intervals. This will also help in cross checking the performance of Pollution<br />
control systems implemented in the plant.<br />
6.1.2 FREQUENCY & LOCATIONS OF ENVIRONMENTAL MONITORING<br />
A comprehensive monitoring programme is given under. This environmental monitoring<br />
will be entrusted to a third party.<br />
MONITORING SCHEDULE FOR ENVIRONMENTAL PARAMETERS<br />
S. No. Particulars Frequency of<br />
Monitoring<br />
1. Water & Waste water quality<br />
A. Water quality in the<br />
area<br />
2. Air Quality<br />
A. Stack Monitoring<br />
Once in a month<br />
except for heavy<br />
metals which will be<br />
monitored on quarterly<br />
basis.<br />
Online monitor (for<br />
major stacks)<br />
Once in a month<br />
Duration of<br />
sampling<br />
Composite<br />
sampling<br />
(24 hourly)<br />
B. Ambient Air quality Twice a week 24 hours<br />
continuously<br />
C. Fugitive emission Once in a month<br />
monitoring<br />
3. Meteorological Data<br />
Meteorological data to be Daily<br />
Continuous<br />
monitored at the plant.<br />
monitoring<br />
Parameters required<br />
to be monitored<br />
As per IS: 10500<br />
SPM<br />
SO 2 & NO x<br />
RPM, SPM,<br />
SO 2 & NO x<br />
Particulate matter.<br />
Temperature, RH, rainfall,<br />
wind direction & speed.<br />
PIONEER ENVIRO 6 - 2 <strong>Environment</strong>al Impact Assessment Report<br />
Laboratories & Consultants Pvt. Ltd.