B.S. SPONGE PRIVATE LIMITED<br />

Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />

REIA Report for the Proposed Mini Integrated Steel Plant<br />

Chapter – 11<br />

11<br />

CHAPTER –XI<br />

SUMMARY<br />

1. This expansion project envisages setting up of 120,000 TPA Sponge Iron, 1,62,000 TPA<br />

Ingots/ Billets, 1,05,000 TPA Rolled products, Ferro alloys of 25000 TPA and 48 MW<br />

electricity through WHRB & FBC routes. The proposed expansion will be taken-up in the<br />

existing plant premises only.<br />

2. The flue gases from the rotary kilns will be pass through Waste Heat Recovery Boiler and<br />

after heat recovery the flue gases will pass through state-of-the-art ESP to bring down the<br />

particulate matter in the exhaust gases to within 50 mg/Nm3 and will be discharged into the<br />

atmosphere through a combined stack (Twin flues) of 60 m height. The secondary fugitive<br />

emissions from the SMS will be treated in a fume extraction system and will be discharged<br />

into the atmosphere through a stack of 30 m height. The gases from the FBC boiler will be<br />

treated in an ESP to achieve < 50 mg/Nm3 and will be discharged into the atmosphere<br />

through a stack of 72 m height for effective dispersion of emissions into the atmosphere The<br />

resultant Ground Level Concentrations of SO 2 , NO X & SPM in the post expansion project<br />

scenario are within the National Ambient Air Quality Standards (NAAQS). Hence there will<br />

not be any adverse impact on air environment due to the proposed expansion project.<br />

3. Interlocking system will be provided to ESP in such a way that , when the particulate matter<br />

in the exhaust gas exceeds the norms the feed to raw material will stop and thereby no<br />

production in the unit. The unit will restarted only when the air pollution control system is<br />

able to comply with the norms.<br />

4. Energy meters will be provided to air pollution control systems to ensure continuous<br />

operation of the control systems.<br />

PIONEER ENVIRO 11- 1 <strong>Environment</strong>al Impact Assessment Report<br />

Laboratories & Consultants Pvt. Ltd.