B.S. SPONGE PRIVATE LIMITED<br />
Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />
REIA Report for the Proposed Mini Integrated Steel Plant<br />
Chapter – 11<br />
11<br />
CHAPTER –XI<br />
SUMMARY<br />
1. This expansion project envisages setting up of 120,000 TPA Sponge Iron, 1,62,000 TPA<br />
Ingots/ Billets, 1,05,000 TPA Rolled products, Ferro alloys of 25000 TPA and 48 MW<br />
electricity through WHRB & FBC routes. The proposed expansion will be taken-up in the<br />
existing plant premises only.<br />
2. The flue gases from the rotary kilns will be pass through Waste Heat Recovery Boiler and<br />
after heat recovery the flue gases will pass through state-of-the-art ESP to bring down the<br />
particulate matter in the exhaust gases to within 50 mg/Nm3 and will be discharged into the<br />
atmosphere through a combined stack (Twin flues) of 60 m height. The secondary fugitive<br />
emissions from the SMS will be treated in a fume extraction system and will be discharged<br />
into the atmosphere through a stack of 30 m height. The gases from the FBC boiler will be<br />
treated in an ESP to achieve < 50 mg/Nm3 and will be discharged into the atmosphere<br />
through a stack of 72 m height for effective dispersion of emissions into the atmosphere The<br />
resultant Ground Level Concentrations of SO 2 , NO X & SPM in the post expansion project<br />
scenario are within the National Ambient Air Quality Standards (NAAQS). Hence there will<br />
not be any adverse impact on air environment due to the proposed expansion project.<br />
3. Interlocking system will be provided to ESP in such a way that , when the particulate matter<br />
in the exhaust gas exceeds the norms the feed to raw material will stop and thereby no<br />
production in the unit. The unit will restarted only when the air pollution control system is<br />
able to comply with the norms.<br />
4. Energy meters will be provided to air pollution control systems to ensure continuous<br />
operation of the control systems.<br />
PIONEER ENVIRO 11- 1 <strong>Environment</strong>al Impact Assessment Report<br />
Laboratories & Consultants Pvt. Ltd.