26.01.2014 Views

bs sponge private limited - India Environment Portal

bs sponge private limited - India Environment Portal

bs sponge private limited - India Environment Portal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B.S. SPONGE PRIVATE LIMITED<br />

Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />

REIA Report for the Proposed Mini Integrated Steel Plant<br />

Chapter – 1<br />

1.3 BRIEF DESCRIPTION<br />

1.3.1 NATURE OF THE PROJECT<br />

The proposed expansion project involves production of Sponge Iron, Billets, Structural<br />

steels, Ferro alloys and generation of 48 MW electricity.<br />

1.3.2 SIZE OF THE PROJECT<br />

M/s B.S. Sponge Private Limited has proposed to go for expansion in the existing Plant<br />

premises. The existing and proposed expansion details are furnished below<br />

S.No Units Existing production Proposed production Total<br />

capacity (TPA) capacity (TPA) (TPA)<br />

1. Sponge Iron 60,000 1,20,000 1,80,000<br />

2. Induction Furnace --- 1,62,000 1,62,000<br />

with Concast<br />

3. Rolling Mill --- 1,05,000 1,05,000<br />

4. Ferro alloys --- 25,000 25,000<br />

5.<br />

Power<br />

Plant<br />

WHRB --- 12 12<br />

FBC --- 36 36<br />

Total 48 48<br />

The capital investment of the expansion project is Rs. 329.95 Crores.<br />

1.3.3 LOCATION OF THE PROJECT<br />

M/s B.S. Sponge Private Limited is an existing plant operating 2 x 100 TPD Sponge<br />

Iron Plant in Taraimal Village, Ghargoda Tehsil, Raigarh District. The following factors<br />

have been considered for selection of site for the existing plant.<br />

a. Availability of suitable and adequate facilities.<br />

b. Availability of water.<br />

c. Availability of raw materials.<br />

d. Availability of man power.<br />

e. Availability of infrastructural facilities<br />

f. Suitability of land from geological and topographical aspects.<br />

g. The following <strong>Environment</strong>al aspects<br />

PIONEER ENVIRO 1 - 3 <strong>Environment</strong>al Impact Assessment Report<br />

Laboratories & Consultants Pvt. Ltd.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!