26.01.2014 Views

bs sponge private limited - India Environment Portal

bs sponge private limited - India Environment Portal

bs sponge private limited - India Environment Portal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B.S. SPONGE PRIVATE LIMITED<br />

Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />

REIA Report for the Proposed Mini Integrated Steel Plant<br />

Chapter – 10<br />

10.2.7. RAINWATER HARVESTING (TOR # 24)<br />

Rainwater harvesting structures will be constructed to harvest the run-off water from roof<br />

tops by laying a separate storm water drainage system for recharging of ground water.<br />

4 nos. of rain water harvesting structures each of size 10m x 5m x 1.5 m will be provided<br />

in the plant to recharge the precious ground water. Rain harvesting pits are being<br />

constructed as per guidelines of State Ground Water Board.<br />

10.3 POST PROJECT MONITORING STRATEGY<br />

The monitoring of various environmental parameters is necessary which is part of the<br />

environmental protection measures. Monitoring is an important feature because the<br />

efficiency of control measures can only be determined by monitoring. A comprehensive<br />

monitoring programme is given under.<br />

Locations and frequency of monitoring as per the guidelines of CECB and MOEF are<br />

tabulated below.<br />

MONITORING SCHEDULE FOR ENVIRONMENTAL<br />

PARAMETERS<br />

S. No. Particulars Frequency of<br />

Monitoring<br />

1. Water & Waste water<br />

quality<br />

A. Water quality in the<br />

area<br />

Once in a month<br />

except for heavy<br />

metals which will be<br />

monitored on quarterly<br />

basis.<br />

2. Air Quality<br />

A. Stack Monitoring Online monitors<br />

(major stacks)<br />

Duration of<br />

sampling<br />

Composite<br />

sampling<br />

(24 hourly)<br />

Parameters required to<br />

be monitored<br />

As per IS: 10500<br />

Once in a month<br />

SO 2 & NO x<br />

B. Ambient Air quality Twice a week 24 hours RSPM, SPM,<br />

continuously SO 2 & NO x<br />

C. Fugitive emissions Once in three 8 hourly Particulate matter<br />

months<br />

3. Meteorological Data<br />

Meteorological data to be Daily<br />

Continuous Temperature, RH, rainfall,<br />

monitored at the plant.<br />

monitoring wind direction & speed.<br />

PIONEER ENVIRO 10- 21 <strong>Environment</strong>al Impact Assessment Report<br />

Laboratories & Consultants Pvt. Ltd.<br />

SPM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!