17 Permission for the drawl of 3,800 m 3 /day water from Mahanadi<br />

River/Chuinkansa nallah from the concerned department.and<br />

water balance data including quantity of effluent generated,<br />

recycled and reused and discharged is to be provided. Methods<br />

adopted/to be adopted for the water conservation.<br />

18 Surface water quality of nearby rivers (60 m upstream and<br />

downstream) and other surface drains at eight locations must be<br />

ascertained.<br />

19 Ground water monitoring minimum at 8 locations and near solid<br />

waste dump zone, Geological features and Geo-hydrological<br />

status of the study area are essential as also. Ecological status<br />

(Terrestrial and Aquatic) is vital.<br />

3-29, 10-13<br />

3-13 to 3-15<br />

3-18 to 3-26<br />

20 Action plan for solid/hazardous waste generation, storage, 10-16<br />

utilization and disposal particularly char, fly ash and ferro alloy<br />

slag. Assurance that 100 % char will be used in the FBC boiler<br />

and copies of MOU regarding utilization of ash should be<br />

included<br />

21 Generation and utilization of waste/fuel gases and their utilization<br />

2-18<br />

in the CPP have to be set out.<br />

22. Risk assessment and damage control needs to be addressed 7-1 to 7-17<br />

23 Occupational health of the workers needs elaboration 7-17 to 7-21<br />

24 Green belt development plan in 33 % area and a scheme for<br />

10-19 to 10-22<br />

rainwater harvesting have to be put in place.<br />

25 Socio-economic development activities need to be elaborated 7-21 to 7-22<br />

upon<br />

26 Total capital cost and recurring cost / annum for environmental 10-22<br />

pollution control measures.<br />

27 Plan for the implementation of the recommendations made for the<br />

Steel Plants in the CREP guidelines must be prepared<br />

10-13