B.S. SPONGE PRIVATE LIMITED<br />

Village: Taraimal, Tehsil: Gharghoda, District: Raigarh, (C.G.)<br />

REIA Report for the Proposed Mini Integrated Steel Plant<br />

Chapter – 2<br />

The alloy cake from C.I. Pan is removed and broken manually with hammer to required<br />

lump size.<br />

The slag produced in the process, generally free from metal, after cooling is removed by<br />

lorry to the slag dump.<br />

2.5.5.5 POWER GENERATION: (TOR # 21)<br />

Waste Heat Recovery Boilers will be installed behind the ABC of DRI kiln in bypass<br />

configuration. The flue gases after ABC will be taken to unifired furnace chamber and<br />

then flow over banks of super heater, convective evaporator and economizer before being<br />

discharged to atmosphere through ESP, ID fan and stack. 12 MW electricity will be<br />

generated from WHRB. In the Fluidized Bed Combustion boiler envisaged, combustion<br />

of fuel particles is achieved in suspension with an inert aggregate i.e. sand. Combustion<br />

air will be fed through air nozzles from underneath into the sand fuel bed. Oil burner will<br />

be provided for start up and low load flame stabilization. The fuels proposed in FBC<br />

Boiler are Char & Coal. The flue gases will pass over various heat transfer surfaces to<br />

ESP and then finally discharged through ID fan and stack. 36 MW of Power generation<br />

proposed through FBC Boiler.<br />

The condensate after condenser of STG will be pumped to a common deaerator by<br />

condensate extraction pumps. Feed water from the deaerator will be pumped to the waste<br />

heat recovery boiler as well as FBC boiler by boiler feed pumps.<br />

The steam generated from both the WHRB and FBC boilers will drive the steam turbine<br />

through a common steam header to generate 48 MW of Electricity. The power generated<br />

will be used for captive consumption.<br />

Process flow diagram is shown as figure 2.1.<br />

PIONEER ENVIRO 2 - 18 <strong>Environment</strong>al Impact Assessment Report<br />