The first phase of the development is constructed and platted. All 325 lots approved with the<br />
first phase are eligible for building permits. Another 80 townhome lots are in for plat review. 594<br />
units remain in the latter phases of the development. In 2006, the BoCC amended the Future<br />
Land Use Map designation for the bulk of the development from RL-4X to RMX. The effect of<br />
the amendment rendered PD 02-22 to legal non-conforming status because the minimum density<br />
in RMX is six (6) units per acre and 999 units on 638 (less1/5 in wetlands) acres is less than two<br />
(2) units per acre. If the project was to meet current requirements, a minimum of 3,048<br />
residential units could be required of the project and the developer is within rights to reach a<br />
maximum of 7,620 residential units without <strong>Planning</strong> Commission approval. However, since PD<br />
02-22 was established prior to the 2006 Future Land Use Map amendment, any increase in the<br />
number of units will require a public hearing to either amend the PD or abrogate it.<br />
The portion of the request relating to the variance for a wall and associated signage is partially<br />
prompted by the dedication of a portion of the property for the construction of Pine Tree Trail.<br />
The original design incorporated the recently constructed road as more of an element of the<br />
project. As it is laid out today, the development does not have as much of a presence on Ronald<br />
Reagan Parkway rather an entrance further south on Pine Tree Trail. The variance will restore<br />
the former presence visually by placing the wall and sign closer to the road right-of-way. A<br />
portion of the wall and sign is proposed for placement within the right-of-way. Approval of such<br />
will be administrative through acceptance of a right-of-way use agreement.<br />
Findings of Fact<br />
● PD 02-22M, currently known as Oakmont, is a residential development comprised of 999<br />
dwelling units, both attached and detached.<br />
●<br />
●<br />
●<br />
●<br />
●<br />
●<br />
There are 4<strong>05</strong> residential building pads constructed and 325 lots are platted within the<br />
development, but no dwelling units are constructed. There is an 80 unit townhome phase<br />
under plat review with previously constructed infrastructure as well.<br />
Each residential building pad has access to a paved road, potable water, wastewater<br />
disposal, and reclaimed water for irrigation.<br />
The site is located within a Residential Medium–X (RMX) Future Land Use district. The<br />
project does not meet the minimum density (six dwelling units per acre). PD 02-22M<br />
was approved by the Board of <strong>County</strong> Commissioners and a portion of the project’s<br />
construction was completed prior to the property becoming RMX; therefore, it is<br />
considered a legal non-conforming use and vested under the current site plan (see Exhibit<br />
4).<br />
Under a <strong>County</strong> initiated amendment to the Comprehensive Plan Future Land Use Map in<br />
2006 (CPA 06B-01), PUD 02-22 (Oakmont) along with other single family residential<br />
developments was changed to RMX, rendering them non-conforming.<br />
Staff has no documentation as to the reason that the PUD was rendered a non-conforming<br />
use or any data to support the public purpose.<br />
The site is located within the Ronald Reagan Parkway Selected Area Plan.<br />
●<br />
PD 02-22 was originally approved for a 999 unit short-term rental community with<br />
28,000 square feet of commercial, an 18-hole golf course, maintenance facility and<br />
driving range on 638± acres in an RL-1X district. The applicant is requesting an<br />
DRC Findings/Recommendation Page 2 of 21<br />
Level 3/eep 11/8/<strong>2012</strong> 12:06:42 PM PD 02-22M <strong>December</strong> 5, <strong>2012</strong>