B. Roadway Conditions:<br />

Since US 98 North is maintained by the Florida Department of Transportation (FDOT), a<br />

pavement condition index (PCI) rating is not available; however, a site visit in October of <strong>2012</strong><br />

confirmed that the roadway is in good condition, has adequate pavement width and should not be<br />

adversely impacted by approval of this modification to an existing conditional use.<br />

Proposed Site<br />

32.01 ± acres<br />

(ARRX)<br />

Permitted Density/<br />

Maximum number of<br />

Lots<br />

Average Annual Daily<br />

Trips (AADT)<br />

Estimated Impact Analysis (Residential / Commercial)<br />

(Existing Land Use<br />

Designation)<br />

(Maximum Density /<br />

usage)<br />

(Proposed Site Plan)<br />

32.01 acres A/RRX;<br />

(1 du/ 10 ac= 3 du)<br />

4,000 sq. ft. retail<br />

building and nonirrigated<br />

fields & 3 du<br />

4,000 sq. ft. retail<br />

building and nonirrigated<br />

fields<br />

2 346 + 24 = 370 346<br />

4 15 + 4 = 19 15<br />

PM Peak Hour Trips<br />

Source: Institute of Transportation Engineers (ITE)- 8 th Edition<br />

C. Planned Improvements:<br />

There are no planned improvements for this segment of US 98 North at this time.<br />

Environmental Conditions:<br />

A. Surface Water/ Drainage:<br />

There are no surface water bodies on or near the site, and the site naturally drains from the north<br />

and west portion of the site to the south and east portion of the site. The highest elevation on site<br />

is 136 feet (near the center of the site) and the lowest is 125 feet.<br />

B. Wetlands/Floodplains:<br />

Approximately fifty percent (50%) of the site is uplands, and the remainder of the site contains<br />

wetlands and/or floodplain. The wetlands and floodplain are located in the southwest and<br />

eastern portion of the site. The paintball fields are all located on the upland portions of the site,<br />

and a Level 2 site plan showed the woodsball fields as being approximately 150’ from the<br />

floodplain and wetlands located on site. During the original hearing for CU 11-<strong>05</strong>, the applicant<br />

indicated that no activities will be carried out on the floodplain and/or wetland portions of the<br />

site. In regards to paintball being played in an Area of Critical State Concern, the applicant<br />

provided information during the original CU 11-<strong>05</strong> review concerning the chemical make up of<br />

the paintballs utilized in the proposed use. According to the applicant, the paintballs used on site<br />

are environmentally safe. The information provided by the applicant indicates that the “paint”<br />

used in capsules is not really paint, but rather a starch mixture colored with food coloring that is<br />

non-toxic to participants and the environment.<br />

DRC Findings/Recommendation Page 10 of 23<br />

Level 3/TAV 11/21/<strong>2012</strong> 9:52 AM CU 11-<strong>05</strong>M <strong>December</strong> 5, <strong>2012</strong>