02.02.2014 Views

Wednesday, December 05, 2012 - Regular Planning ... - Polk County

Wednesday, December 05, 2012 - Regular Planning ... - Polk County

Wednesday, December 05, 2012 - Regular Planning ... - Polk County

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROPOSED MODIFICATIONS TO CONDITIONS OF APPROVAL<br />

9. Where the collector road abuts lots along the Briar Grove subdivision, specifically, lots<br />

120 126 and lots 234-238 along Grove Park Drive and Lot 233 on Thornbush Parkway,<br />

the developer shall provided a landscape screening consisting of shrubs and trees. This<br />

landscape screen shall consist of planting with a minimum height of three feet at the time<br />

of planting and be capable of attaining a height of five feet within two years. Tree<br />

planting shall be at intervals of 40 feet and shall not conflict with height restrictions<br />

adjacent to the power line easement. Existing vegetation meeting the buffer requirement<br />

may be utilized in lieu of landscaping. [Applicant Request]<br />

10. All new lots adjacent or abutting the Sunridge Woods Subdivision, specifically Tract 3<br />

(single family detached villas) & Tract 5 (residential villas) shall be the average lot size<br />

(width and depth) or larger lot size as those lots within Sunridge Woods (adjacent lots).<br />

[Applicant Request]<br />

112. Prior to the issuance of the first building permit, the developer shall tender $150,000<br />

cash, or unconditional letter of credit, in favor of <strong>Polk</strong> <strong>County</strong>. These funds shall be used<br />

to extend the collector road south and east to its intersection with <strong>County</strong> Road 547. Any<br />

interest earned on deposited funds shall be retained by the <strong>County</strong> and the <strong>County</strong> shall<br />

have up to five years to utilize the funds in the prosecution of the transportation facility.<br />

Any funds not expended by the <strong>County</strong> within this five year period shall be refunded to<br />

the developer. The Oakmont PD shall be responsible for payment of $150,000 to <strong>Polk</strong><br />

<strong>County</strong>. The payments and requirements shall be outlined in the Development<br />

Agreement with <strong>Polk</strong> <strong>County</strong>, Case# DA 03-04.<br />

123. The developer shall provide such additional right-of-way as may be necessary to create<br />

an 80 foot right-of-way for Bowen Road. Consideration shall be given to existing rightof-way<br />

or maintenance plat.<br />

134. The applicant shall provide sidewalks a minimum of four (4) feet in width along the<br />

entire frontage on CR 54. Additionally, the applicant shall construct sidewalks along the<br />

entire eastern side of the new <strong>County</strong> collector road to the project’s gated entrance and<br />

along the western side of the <strong>County</strong> collector road to the proposed access point to the<br />

commercial area. [COMPLETED] The applicant shall provide internal sidewalks to<br />

connect all residential tracts, the commercial tract, the clubhouse and all active common<br />

areas to Pine Tree Trail.<br />

145. The applicant shall provide an entrance onto Bowen Road to be used for public safety<br />

vehicles (Sheriff, Fire & EMS), emergency ingress and egress.<br />

15. The applicant shall provide a 10 foot wide landscape buffer along the boundary of<br />

Sunridge Woods, specifically the boundary within Tracts 3 & 5, shall to be installed prior<br />

to the issuance of building permits for units within Tracts 3 & 5 abutting Sunridge<br />

Woods. This landscaped buffer shall be on a designated open space/landscape tract<br />

dedicated to the Home Owners Association (HOA) or similar entity.<br />

DRC Findings/Recommendation Page 19 of 21<br />

Level 3/eep 11/8/<strong>2012</strong> 12:06:42 PM PD 02-22M <strong>December</strong> 5, <strong>2012</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!