Wednesday, December 05, 2012 - Regular Planning ... - Polk County
Wednesday, December 05, 2012 - Regular Planning ... - Polk County
Wednesday, December 05, 2012 - Regular Planning ... - Polk County
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Development Review Committee Recommendation: Based on information provided with the<br />
proposed development application, the Development Review Committee finds that the proposed<br />
request IS consistent with the surrounding land uses and general character of the area; and IS<br />
consistent with the <strong>Polk</strong> <strong>County</strong> Land Development Code and the <strong>Polk</strong> <strong>County</strong> Comprehensive Plan.<br />
Based upon the findings of fact, the information provided by the applicant, and a recent site visit; the<br />
Development Review Committee recommends APPROVAL of CU 08-04M with conditions.<br />
CONDITION(S) OF APPROVAL:<br />
1. All previous conditions of approval shall be revoked and replaced with the conditions of<br />
approval listed herein. [PLG]<br />
2. This conditional use approval shall allow only the structures and facilities shown on the<br />
binding site plan. [PLG]<br />
3. Operations at this facility shall be limited to between 9:00 AM and 10:00 PM daily. [PLG]<br />
4. All weapons ranges shall be operated consistent with the Florida Department of<br />
Environmental Protection, Bureau of Solid and Hazardous Waste Best Management Practices<br />
for Environmental Stewardship of Florida Shooting Ranges, 2004 Edition or better. [PLG]<br />
5. If any additional site clearing or grubbing occurs, the applicant shall hire a qualified<br />
professional to conduct a site survey/walkover to ensure that no threatened or endangered<br />
plant or animal species exist on the site. If any are discovered, the applicant shall properly<br />
protect the specie(s) or mitigate any impacts consistent with federal, state and local law.<br />
[PLG]<br />
6. With the exception of the areas specified for development on the site plan, none of the<br />
existing vegetation shall be cleared unless for approved public safety purposes (e.g. fire<br />
breaks, prescribed burns, ecological habitat maintenance). [PLG]<br />
7. Prior to Level 2 Review approval, the applicant shall submit a hydraulics calculation certified<br />
by a registered professional engineer, that adequate water pressure and capacity exist to<br />
maintain fire flow as determined by the <strong>Polk</strong> <strong>County</strong> Fire Marshall. [FM]<br />
8. A sufficient application for Level 2 Review shall be submitted reflecting all conditions of<br />
approval. [PLG]<br />
9. This conditional use shall not impede any existing legal easements. [PLG]<br />
10. The applicant shall maintain external berms of at least 18 feet in height around the perimeter<br />
of all shooting bays. [PLG]<br />
11. The site shall be maintained to ensure it is clean and free of litter, debris, and refuse on a<br />
daily basis. [PLG]<br />
12. All on-site activity shall be consistent with all Recreation conditions and requirements of<br />
LDC Chapter 303; however, landscape buffering shall be required as provided on the<br />
approved Level 3 conditional use site plan. [PLG]<br />
DRC Findings/Recommendation Page 3 of 10<br />
Level 3/TDW 11/21/<strong>2012</strong> 2:04:31 PM CU 08-04M <strong>December</strong> 5, <strong>2012</strong>