Section 7. <strong>Flare</strong> <strong>Reduction</strong> <strong>Project</strong> <strong>Family</strong><br />
EXHIBIT 7.2:<br />
<strong>Flare</strong> Gas Recovery for Re-injection and Utilization, continued<br />
Vented Emissions (VENT 1 )<br />
Vented emissions associated with operation of the existing equipment are unchanged by the<br />
project activity and therefore cancel out in the estimation of project emission reductions.<br />
Fugitive Emissions (FUG 1 ):<br />
Fugitive emissions associated with the operation of existing equipment will be unchanged by<br />
the project activity, and therefore cancel out in the calculation of project emission reductions.<br />
Indirect Emissions (IND 1 ):<br />
There are no indirect emissions associated with either the baseline or the project scenario.<br />
Baseline emissions = CMB 1 + VENT 1 + FUG 1 + IND 1<br />
= 5,749,920 + 0 + 0 + 0<br />
= 5,749,920 tonnes CO 2 e.<br />
<strong>Project</strong> Emissions Estimate<br />
<strong>Project</strong> emissions = CMB 2 +VENT 2 + FUG 2 + IND 2<br />
where,<br />
CMB 2 = Combustion emissions associated with increased use of existing equipment<br />
at the OGPP to provide compression for associated gas transport from the<br />
OGPP by means of the new gas pipelines to the IPP and the oilfield<br />
reinjection area. No gas will be flared after implementation of the project<br />
activity.<br />
VENT 2 = Vented gas associated with transport in new pipelines of the processed<br />
low- and medium-pressure associated gas streams to the IPP and to the<br />
oilfield re-injection area.<br />
FUG 2<br />
= Pipeline fugitive emissions associated with transport of processed low- and<br />
medium-pressure associated gas from OGPP to the IPP and the oilfield reinjection<br />
area. Note that fugitive emissions from process units handling<br />
the associated gas at the OGPP are unchanged by the project scenarios, and<br />
therefore cancel out in the calculation of project emission reductions.<br />
IND 2 = There are no indirect emissions associated with either the baseline or the<br />
project scenario.<br />
Combustion emissions (CMB 2 ):<br />
Fuel combustion emissions are calculated based on projected fuel consumption rates and fuel<br />
analysis data. Based on the data presented above, 2.0 ×108 m3/year of associated gas will be<br />
consumed to meet the on-site energy needs of the OGPP after implementation of the project.<br />
The emission calculation conservatively assumes that all the carbon in the fuel will be<br />
converted to CO2 during the combustion process and discharged to the atmosphere, consistent<br />
with the API Compendium.<br />