05.03.2014 Views

Part III: Flare Reduction Project Family - IPIECA

Part III: Flare Reduction Project Family - IPIECA

Part III: Flare Reduction Project Family - IPIECA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 7. <strong>Flare</strong> <strong>Reduction</strong> <strong>Project</strong> <strong>Family</strong><br />

EXHIBIT 7.2:<br />

<strong>Flare</strong> Gas Recovery for Re-injection and Utilization, continued<br />

Vented Emissions (VENT 1 )<br />

Vented emissions associated with operation of the existing equipment are unchanged by the<br />

project activity and therefore cancel out in the estimation of project emission reductions.<br />

Fugitive Emissions (FUG 1 ):<br />

Fugitive emissions associated with the operation of existing equipment will be unchanged by<br />

the project activity, and therefore cancel out in the calculation of project emission reductions.<br />

Indirect Emissions (IND 1 ):<br />

There are no indirect emissions associated with either the baseline or the project scenario.<br />

Baseline emissions = CMB 1 + VENT 1 + FUG 1 + IND 1<br />

= 5,749,920 + 0 + 0 + 0<br />

= 5,749,920 tonnes CO 2 e.<br />

<strong>Project</strong> Emissions Estimate<br />

<strong>Project</strong> emissions = CMB 2 +VENT 2 + FUG 2 + IND 2<br />

where,<br />

CMB 2 = Combustion emissions associated with increased use of existing equipment<br />

at the OGPP to provide compression for associated gas transport from the<br />

OGPP by means of the new gas pipelines to the IPP and the oilfield<br />

reinjection area. No gas will be flared after implementation of the project<br />

activity.<br />

VENT 2 = Vented gas associated with transport in new pipelines of the processed<br />

low- and medium-pressure associated gas streams to the IPP and to the<br />

oilfield re-injection area.<br />

FUG 2<br />

= Pipeline fugitive emissions associated with transport of processed low- and<br />

medium-pressure associated gas from OGPP to the IPP and the oilfield reinjection<br />

area. Note that fugitive emissions from process units handling<br />

the associated gas at the OGPP are unchanged by the project scenarios, and<br />

therefore cancel out in the calculation of project emission reductions.<br />

IND 2 = There are no indirect emissions associated with either the baseline or the<br />

project scenario.<br />

Combustion emissions (CMB 2 ):<br />

Fuel combustion emissions are calculated based on projected fuel consumption rates and fuel<br />

analysis data. Based on the data presented above, 2.0 ×108 m3/year of associated gas will be<br />

consumed to meet the on-site energy needs of the OGPP after implementation of the project.<br />

The emission calculation conservatively assumes that all the carbon in the fuel will be<br />

converted to CO2 during the combustion process and discharged to the atmosphere, consistent<br />

with the API Compendium.<br />

October 2009 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!