Section 7. <strong>Flare</strong> <strong>Reduction</strong> <strong>Project</strong> <strong>Family</strong><br />

EXHIBIT 7.2:<br />

<strong>Flare</strong> Gas Recovery for Re-injection and Utilization, continued<br />

Indirect emissions (IND 2 ):<br />

There are no indirect emissions associated with either the baseline or the project scenario.<br />

PROJECT EMISSIONS = CMB 2 + VENT 2 + FUG 2 + IND 2<br />

= 475,200+224+ 1,025 +0<br />

= 476,449 tonnes CO 2 e per year<br />

EMISSION REDUCTIONS = Baseline Emissions – <strong>Project</strong> Emissions<br />

= (5,749,920 – 476,449 ) tonnes CO 2 e per year<br />

= 5,273,471 tonnes CO 2 e per year<br />

Monitoring<br />

Monitoring for this project example would include the following:<br />

• The composition and quantity of unprocessed associated gas delivered to the OGPP and<br />

of the processed high-, medium-, and low-pressure gas streams produced by the OGPP.<br />

• Quantities of processed gas sent to the IPP and the oilfield re-injection area.<br />

• The types and quantities of any additional fuels consumed in the processing and transport<br />

of the recovered gas, if any.<br />

• The CH 4 content and operating time of equipment and processes subject to venting and<br />

fugitive emissions, and associated with the processing and transport of the recovered gas.<br />

October 2009 41