Download - Buderus
Download - Buderus
Download - Buderus
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
8<br />
Start-up procedure<br />
For first time start up it is necessary to set the DHW temperature<br />
knob and the space heating water temperature knob<br />
to the desired setting (see subsection 9.3.2 and 9.3.3).<br />
Factory setting is "0".<br />
100<br />
90<br />
110<br />
120<br />
130<br />
140<br />
90<br />
110<br />
130<br />
150<br />
170<br />
190<br />
WARNING<br />
There is a hot water scald potential if the BC10<br />
is set too high.<br />
8.3 Filling the condensate trap<br />
• Make sure that you fill the condensate trap with water.<br />
This is to prevent exhaust gases from entering the room.<br />
• Remove the condensate trap (see fig. 32) by disconnecting<br />
the connection to the heat exchanger and the<br />
connection to the condensate bypass pipe.<br />
• Fill with water and refit the condensate trap in reverse<br />
order.<br />
WARNING<br />
Danger of fatal accident due to poisoning. If the<br />
condensate trap is not filled with water, flue gas<br />
can escape and put people's lives at risk.<br />
Fig. 32<br />
Filling water into the condensate trap<br />
8.4 Bleeding the gas supply valve<br />
• Loosen the screw plug on the testing nipple for the gas<br />
connection and venting (fig. 33, pos. 1) by two turns and<br />
fit a hose.<br />
• Slowly open the gas shut-off valve.<br />
• Run the gas that is discharged through a water bath.<br />
• Close the gas shut-off valve when no more air is<br />
released.<br />
• Remove the hose and tighten the screw plug again.<br />
1<br />
8.5 Checking the combustion air/flue gas<br />
connection<br />
Check the following points:<br />
– Is the prescribed combustion air/flue system used?<br />
– Have the instructions for configuring the flue system as<br />
specified in the relevant Installation instruction for the flue<br />
gas system been observed?<br />
Fig. 33<br />
Bleeding the gas supply conduit<br />
32<br />
Logamax plus GB142-24/30/45/60 - We reserve the right to make any changes due to technical modifications!