03.07.2014 Views

Highlights 77th Texas Legislature - Senate

Highlights 77th Texas Legislature - Senate

Highlights 77th Texas Legislature - Senate

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

__________________ S TATE<br />

FFAIRS/AgenciesAgencies<br />

TATE AFFAIRS<br />

77 th <strong>Texas</strong> <strong>Legislature</strong><br />

Authorizes DIR and the commission to interface all or parts of the electronic procurement system with<br />

<strong>Texas</strong> Online or use features of <strong>Texas</strong> Online to enhance the electronic procurement system, based on the<br />

assessment.<br />

Provides that the electronic commerce network does not apply to procurements for major construction<br />

projects, as defined by the commission in consultation with DIR, such as procurements made under<br />

Chapter 223, Transportation Code. Requires the commission, in defining a major construction project, to<br />

base its decision on whether the nature of the project is of a type that would make electronic procurement<br />

inappropriate.<br />

Transfers all functions and activities performed by the <strong>Texas</strong> Department of Economic Development<br />

relating to the business daily to the commission.<br />

State Cemetery<br />

Requires the State Cemetery Committee to oversee all operations of the State Cemetery (cemetery),<br />

develop a budget for the operations of the commission relating to the cemetery and determine the salary of<br />

employees of the commission whose duties are primarily related to the operation of the cemetery.<br />

Requires the legislature to separately appropriate money to the committee within the appropriations to the<br />

commission for all matters relating to the operation of the cemetery.<br />

Adds standard Sunset Commission language regarding the requirements for members of the committee.<br />

Contracting Methods for Construction of State Facilities<br />

Requires the commission to adopt rules for use of each method of contracting allowed for design and<br />

construction services. Requires the commission, in developing the rules, to solicit advice and comment<br />

from design and construction professionals.<br />

Requires the commission, before advertising, to establish which method of contracting provides the best<br />

value.<br />

Requires the commission to publish in the request for bids, proposals, or qualifications all of the criteria that<br />

will be used to evaluate the offers and to base its selection on those criteria.<br />

Requires the commission to document the basis of its selection and to make the evaluations public not later<br />

than the seventh day after the date the contract is awarded.<br />

Authorizes the commission to use the lowest and best bid method for a project. Sets the procedures for<br />

using the lowest and best bid method and authorizes the commission to reject all bids.<br />

Authorizes the commission to use the design-build method for a project. Requires the commission, in using<br />

that method and in entering into a contract for the services of a design-build firm, to follow certain<br />

procedures. These procedures require:<br />

<strong>Senate</strong> Research Center 256

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!