N479<br />
Stormwater Improvements - Flood Protection - Clearwater - Mandalay<br />
Avenue Outfall<br />
Project Type<br />
AORs<br />
<strong>Water</strong> Quality<br />
Flood Protection<br />
Cooperative Funding<br />
Strategic Initiatives<br />
<strong>Water</strong> Quality Maintenance and Improvement<br />
Floodplain <strong>Management</strong><br />
City of Clearwater<br />
Cooperator(s)<br />
Project Manager Richard Mayer<br />
Task Manager(s)<br />
Status<br />
Proposed Coop. Funding Application<br />
Recommendation<br />
Fund as a High priority. This funding request is for proposed implementation of BMPs that will protect, enhance and restore water<br />
quality while achieving flood protection for the Coastal Beach Island <strong>Water</strong>shed, Magnolia Drive Improvement Area, in the City of<br />
Clearwater. All permits have been obtained for the project, and construction plans and documents are 90% complete.<br />
Description<br />
This proposed project is for the Implementation of Best <strong>Management</strong> Practices (BMPs) element of the <strong>District</strong>'s <strong>Water</strong>shed<br />
<strong>Management</strong> Program (WMP) in the Beach Island <strong>Water</strong>shed, Mandalay Avenue Improvement Area. The watershed covers an area<br />
of approximately 21 acres and is located in Clearwater. This project consists of increasing pipe sizes and adding end-of-pipe<br />
treatment to stormwater runoff. Currently stormwater runoff flows untreated through existing undersized pipe systems directly into<br />
Clearwater Harbor. Implementation of BMPs for this project includes the following tasks: construction of the BMPs and construction<br />
engineering and inspection.<br />
Benefits<br />
Implementation of BMPs will improve the level of flood protection and enhance water quality of stormwater runoff discharging into<br />
Clearwater Harbor.<br />
Costs<br />
The total budget amount for this project is $1,600,000, of which the <strong>District</strong>’s share is $800,000 and the City of Clearwater's share<br />
is $800,00. For FY2013, the City is requesting $800,000 in <strong>District</strong> funding for construction and construction engineering and<br />
inspection. The City will contribute $800,000. If the FY2013 request is approved this will complete the project funding requirements.<br />
The probable construction costs for this project are based on a BMP alternative analysis developed the cooperator. The <strong>District</strong><br />
funding amounts shown in the table below include staff salaries.<br />
Additional Information<br />
The WMP includes five major elements: Topographic information, <strong>Water</strong>shed Evaluation, <strong>Water</strong>shed <strong>Management</strong> Plan,<br />
Implementation of BMPs, and Maintenance of <strong>Water</strong>shed Parameters and Models. Implementing elements of the WMP with local<br />
governments is one of the <strong>District</strong>'s Strategic Priorities. The design of the project is at 90%, all permits have been obtained, and<br />
land acquisition is not necessary for this project. Construction could begin in October of 2012. A cooperative funding expenditure<br />
agreement will be developed with the City. The City will manage the project, where the <strong>District</strong> project manager must approve any<br />
agreements to accomplish project tasks.<br />
Prior<br />
Funding<br />
Cumulative<br />
Transfer or<br />
Lapsed Funding<br />
FY2012<br />
Funding<br />
FY2013<br />
Funding<br />
Future<br />
Funding<br />
Total<br />
Funding<br />
<strong>District</strong> Budgeted - Ad Valorem<br />
Based Revenue<br />
010 General Fund (<strong>District</strong>wide) 0 0 0 44<br />
0<br />
44<br />
016 Pinellas-Anclote River Basin 0 0 0 800,000<br />
0 800,000<br />
Project Funds Not Budgeted by the<br />
<strong>District</strong><br />
City of Clearwater 0 0 0 800,000<br />
0 800,000<br />
Total<br />
$1,600,044<br />