N433<br />

Design & Constriction - TBW - <strong>Region</strong>al Reservoir Expansion<br />

Project Type<br />

AORs<br />

<strong>Water</strong> Supply<br />

Cooperative Funding<br />

Strategic Initiatives<br />

Alternative <strong>Water</strong> Supply<br />

<strong>Tampa</strong> <strong>Bay</strong> <strong>Water</strong><br />

Cooperator(s)<br />

Project Manager Alison Ramoy<br />

Task Manager(s)<br />

Status<br />

Proposed Coop. Funding Application<br />

Recommendation<br />

Fund as a Medium priority. The project is to add 3 billion gallons of storage to the <strong>Region</strong>al Reservoir during the renovation and will<br />

add system reliability and approximately 3 mgd of additional water supply at a cost of $66,403,040. The additional capacity is<br />

anticipated to be needed in the future. The cost of developing 3 mgd of water supply would be expected to cost up to $45 million,<br />

based on the average cost of other existing and planned regional scale water supply projects that the <strong>District</strong> has previously<br />

funded. Therefore, staff recommends considering funding the reservoir expansion at up to half of $45 million or $22.5 million (see<br />

the Costs section below for further details). There was sufficient information provided to evaluate the project and the cooperator<br />

has confirmed the necessary matching funds will be requested in their next budget cycle. This project is within the <strong>District</strong>'s<br />

statutory authority to fund and is not the result of a permit requirement or enforcement action.<br />

Description<br />

This alternative water supply project will add 3 billion gallons of additional storage to the <strong>Region</strong>al Reservoir during the renovation<br />

process. The reservoir came on line in 2005, and in 2006 cracks began to appear. In order to properly function, extensive repairs<br />

are necessary. TBWs Board of Directors approved a contract with Kiewit Infrastructure South to renovate the reservoir and to<br />

increase the storage by 3 billion gallons. The additional storage will ensure reliable, sustainable and drought resistant systems,<br />

maximizing alternative supplies to the greatest extent possible. Expanding the existing reservoir will cost hundreds of millions of<br />

dollars less than building a new reservoir.<br />

Benefits<br />

TBWs analysis concludes that 3 mgd of additional water supply can be made available without the need for other new<br />

infrastructure, and that up to 15 mgd can be supplied during drought conditions reducing the potential of exceeding groundwater<br />

permit limits during droughts.<br />

Costs<br />

TBWs application states that the reservoir expansion costs are anticipated to be $66,403,040. As such, the <strong>District</strong> was requested<br />

to fund 50 percent, or $33,201,520. The renovation and expansion work will be done concurrently and it is anticipated that<br />

separating costs from one another will be difficult. Should the Governing Board choose to fund the project, staff recommends<br />

basing funding on the costs associated with previous <strong>District</strong> projects and planned future project costs found in cooperators' water<br />

supply plans, and the <strong>District</strong>'s <strong>Region</strong>al <strong>Water</strong> Supply Plan. These alternative water supply supply projects cost approximately<br />

$15,000,000 per 1 mgd to develop. Therefore, the recommended cost would be $45,000,000, with the <strong>District</strong> contributing<br />

$11,250,000 each in FY2013 and FY2014, for a total of $22,500,000.<br />

Additional Information<br />

Prior<br />

Funding<br />

Cumulative<br />

Transfer or<br />

Lapsed Funding<br />

FY2012<br />

Funding<br />

FY2013<br />

Funding<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

<strong>District</strong> Budgeted - Ad Valorem<br />

Based Revenue<br />

010 General Fund (<strong>District</strong>wide) 0 0 0 5,625,066 5,625,000 11,250,066<br />

011 Alafia River Basin 0 0 0 393,750 393,750 787,500<br />

013 Hillsborough River Basin 0 0 0 2,193,750 2,193,750 4,387,500<br />

015 Coastal Rivers Basin 0 0 0 450,000 450,000 900,000<br />

016 Pinellas-Anclote River Basin 0 0 0 2,542,500 2,542,500 5,085,000<br />

019 Withlacoochee River Basin 0 0 0 45,000 45,000<br />

90,000<br />

Project Funds Not Budgeted by the<br />

<strong>District</strong><br />

<strong>Tampa</strong> <strong>Bay</strong> <strong>Water</strong> 0 0 0 26,940,720 16,962,320 43,903,040<br />

Total<br />

$66,403,106<br />

78