Design & Constriction - TBW - <strong>Region</strong>al Reservoir Expansion<br />
Project Type<br />
AORs<br />
<strong>Water</strong> Supply<br />
Cooperative Funding<br />
Strategic Initiatives<br />
Alternative <strong>Water</strong> Supply<br />
<strong>Tampa</strong> <strong>Bay</strong> <strong>Water</strong><br />
Cooperator(s)<br />
Project Manager Alison Ramoy<br />
Task Manager(s)<br />
Status<br />
Proposed Coop. Funding Application<br />
Recommendation<br />
Fund as a Medium priority. The project is to add 3 billion gallons of storage to the <strong>Region</strong>al Reservoir during the renovation and will<br />
add system reliability and approximately 3 mgd of additional water supply at a cost of $66,403,040. The additional capacity is<br />
anticipated to be needed in the future. The cost of developing 3 mgd of water supply would be expected to cost up to $45 million,<br />
based on the average cost of other existing and planned regional scale water supply projects that the <strong>District</strong> has previously<br />
funded. Therefore, staff recommends considering funding the reservoir expansion at up to half of $45 million or $22.5 million (see<br />
the Costs section below for further details). There was sufficient information provided to evaluate the project and the cooperator<br />
has confirmed the necessary matching funds will be requested in their next budget cycle. This project is within the <strong>District</strong>'s<br />
statutory authority to fund and is not the result of a permit requirement or enforcement action.<br />
Description<br />
This alternative water supply project will add 3 billion gallons of additional storage to the <strong>Region</strong>al Reservoir during the renovation<br />
process. The reservoir came on line in 2005, and in 2006 cracks began to appear. In order to properly function, extensive repairs<br />
are necessary. TBWs Board of Directors approved a contract with Kiewit Infrastructure South to renovate the reservoir and to<br />
increase the storage by 3 billion gallons. The additional storage will ensure reliable, sustainable and drought resistant systems,<br />
maximizing alternative supplies to the greatest extent possible. Expanding the existing reservoir will cost hundreds of millions of<br />
dollars less than building a new reservoir.<br />
Benefits<br />
TBWs analysis concludes that 3 mgd of additional water supply can be made available without the need for other new<br />
infrastructure, and that up to 15 mgd can be supplied during drought conditions reducing the potential of exceeding groundwater<br />
permit limits during droughts.<br />
Costs<br />
TBWs application states that the reservoir expansion costs are anticipated to be $66,403,040. As such, the <strong>District</strong> was requested<br />
to fund 50 percent, or $33,201,520. The renovation and expansion work will be done concurrently and it is anticipated that<br />
separating costs from one another will be difficult. Should the Governing Board choose to fund the project, staff recommends<br />
basing funding on the costs associated with previous <strong>District</strong> projects and planned future project costs found in cooperators' water<br />
supply plans, and the <strong>District</strong>'s <strong>Region</strong>al <strong>Water</strong> Supply Plan. These alternative water supply supply projects cost approximately<br />
$15,000,000 per 1 mgd to develop. Therefore, the recommended cost would be $45,000,000, with the <strong>District</strong> contributing<br />
$11,250,000 each in FY2013 and FY2014, for a total of $22,500,000.<br />
Additional Information<br />
Prior<br />
Funding<br />
Cumulative<br />
Transfer or<br />
Lapsed Funding<br />
FY2012<br />
Funding<br />
FY2013<br />
Funding<br />
Future<br />
Funding<br />
Total<br />
Funding<br />
<strong>District</strong> Budgeted - Ad Valorem<br />
Based Revenue<br />
010 General Fund (<strong>District</strong>wide) 0 0 0 5,625,066 5,625,000 11,250,066<br />
011 Alafia River Basin 0 0 0 393,750 393,750 787,500<br />
013 Hillsborough River Basin 0 0 0 2,193,750 2,193,750 4,387,500<br />
015 Coastal Rivers Basin 0 0 0 450,000 450,000 900,000<br />
016 Pinellas-Anclote River Basin 0 0 0 2,542,500 2,542,500 5,085,000<br />
019 Withlacoochee River Basin 0 0 0 45,000 45,000<br />
90,000<br />
Project Funds Not Budgeted by the<br />
<strong>District</strong><br />
<strong>Tampa</strong> <strong>Bay</strong> <strong>Water</strong> 0 0 0 26,940,720 16,962,320 43,903,040<br />
Total<br />
$66,403,106<br />
78