08.09.2014 Views

TM 3-4240-334-20&P

TM 3-4240-334-20&P

TM 3-4240-334-20&P

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TM</strong> 3-<strong>4240</strong>-<strong>334</strong>-20&P<br />

2-5. SERVICE UPON RECEIPT OF MATERIEL.<br />

This task covers:<br />

Unpacking and Checking Unpacked Equipment.<br />

INITIAL SETUP<br />

Materials/Parts<br />

Battery (Item 2, App B,<br />

<strong>TM</strong> 3-<strong>4240</strong>-<strong>334</strong>-10)<br />

UNPACKING<br />

WARNING<br />

If metal banding straps are used to secure packaging, exercise extreme care<br />

when removing them. The edges of metal binding straps are sharp and can<br />

injure eyes or cut skin.<br />

1. Plywood Container.<br />

NOTE<br />

Retain box, lid, and internal packaging for extended storage or reshipment.<br />

(a) Cut and remove banding straps (1).<br />

(b) Pry lid (2) off box.<br />

2. Large Inner Box.<br />

(a) Remove large inner box (3) from plywood container.<br />

(b) Cut tape (4) securing inner box lid (5).<br />

(c) Remove inner box lid (5).<br />

(d) Remove carrier (6) from inner box (3) and plastic bag.<br />

(e) Remove cardboard section divider (7) from inner box (3).<br />

(f) Remove facepiece assembly carrier (8).<br />

(g) Remove nuclear hood (9).<br />

2-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!