08.09.2014 Views

TM 3-4240-334-20&P

TM 3-4240-334-20&P

TM 3-4240-334-20&P

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TM</strong> 3-<strong>4240</strong>-<strong>334</strong>-20&P<br />

CHECKING UNPACKED EQUIPMENT<br />

1. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged,<br />

report the damage on SF 364, Report of Discrepancy (ROD).<br />

2. Check equipment against packing slip for completeness of shipment. Report all discrepancies in<br />

accordance with the instructions of DA PAM 738-750.<br />

3. Inspect the equipment for modifications. Make note of modifications on appropriate equipment records.<br />

4. Stow equipment in carrier as described in Operator’s Manual, <strong>TM</strong> 3-<strong>4240</strong>-<strong>334</strong>-10.<br />

2-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!