Annex 7: Financing Options <strong>for</strong> Project <strong>Development</strong> (Preparation of<br />
DPRs/Feasibility Report)<br />
Central Govt. Sponsored Scheme of <strong>Urban</strong> <strong>Transport</strong> Planning of Ministry of <strong>Urban</strong><br />
<strong>Development</strong>, GoI JnNURM Scheme<br />
The possible sources of funds <strong>for</strong> preparation of DPR / Feasibility report from Central Government<br />
and Central Govt. sponsored scheme such as JnNURM are given in the Table below:<br />
Possible source of Finance (<strong>for</strong> DPR preparation)<br />
S.No Project Head Projects<br />
JNNURM Scheme Centrally Sponsored<br />
Scheme of <strong>Urban</strong><br />
<strong>Transport</strong> Planning of<br />
Ministry of <strong>Urban</strong><br />
<strong>Development</strong>, GoI<br />
1 Public <strong>Transport</strong><br />
Projects<br />
City bus<br />
service(Bus<br />
Augmentation)/<br />
Bus based Mass<br />
Rapid Transit<br />
System such as<br />
BRTS/ Rail<br />
based Mass<br />
Rapid Transit<br />
System such as<br />
Metro Rail,<br />
Light Rail, Tram<br />
etc.<br />
0.75% to 2% of<br />
the project cost<br />
depending on the<br />
project cost.<br />
Bypass 0.5% to 0.75%<br />
of the project<br />
cost depending<br />
on the project<br />
cost<br />
50% in case of DPR <strong>for</strong><br />
MRTS projects and 80%<br />
of the cost <strong>for</strong> undertaking<br />
studies/ surveys<br />
50% in case of DPR <strong>for</strong> MRTS<br />
projects<br />
80% of the cost <strong>for</strong><br />
undertaking studies/ surveys<br />
2<br />
Network<br />
Improvement<br />
New Road 0.5% to 0.75%<br />
of the project<br />
cost depending<br />
on the project<br />
cost<br />
80% of the cost <strong>for</strong><br />
undertaking studies/ surveys<br />
Tunnels 1.25% to 1.75%<br />
of the project<br />
cost depending<br />
on the project<br />
cost<br />
3 Parking Off street parking<br />
facilities<br />
1.0% to 1.5% of<br />
the project cost<br />
depending on the<br />
80% of the cost <strong>for</strong><br />
undertaking studies/ surveys/<br />
master plans<br />