Annex 7: Financing Options <strong>for</strong> Project <strong>Development</strong> (Preparation of<br />

DPRs/Feasibility Report)<br />

Central Govt. Sponsored Scheme of <strong>Urban</strong> <strong>Transport</strong> Planning of Ministry of <strong>Urban</strong><br />

<strong>Development</strong>, GoI JnNURM Scheme<br />

The possible sources of funds <strong>for</strong> preparation of DPR / Feasibility report from Central Government<br />

and Central Govt. sponsored scheme such as JnNURM are given in the Table below:<br />

Possible source of Finance (<strong>for</strong> DPR preparation)<br />

S.No Project Head Projects<br />

JNNURM Scheme Centrally Sponsored<br />

Scheme of <strong>Urban</strong><br />

<strong>Transport</strong> Planning of<br />

Ministry of <strong>Urban</strong><br />

<strong>Development</strong>, GoI<br />

1 Public <strong>Transport</strong><br />

Projects<br />

City bus<br />

service(Bus<br />

Augmentation)/<br />

Bus based Mass<br />

Rapid Transit<br />

System such as<br />

BRTS/ Rail<br />

based Mass<br />

Rapid Transit<br />

System such as<br />

Metro Rail,<br />

Light Rail, Tram<br />

etc.<br />

0.75% to 2% of<br />

the project cost<br />

depending on the<br />

project cost.<br />

Bypass 0.5% to 0.75%<br />

of the project<br />

cost depending<br />

on the project<br />

cost<br />

50% in case of DPR <strong>for</strong><br />

MRTS projects and 80%<br />

of the cost <strong>for</strong> undertaking<br />

studies/ surveys<br />

50% in case of DPR <strong>for</strong> MRTS<br />

projects<br />

80% of the cost <strong>for</strong><br />

undertaking studies/ surveys<br />

2<br />

Network<br />

Improvement<br />

New Road 0.5% to 0.75%<br />

of the project<br />

cost depending<br />

on the project<br />

cost<br />

80% of the cost <strong>for</strong><br />

undertaking studies/ surveys<br />

Tunnels 1.25% to 1.75%<br />

of the project<br />

cost depending<br />

on the project<br />

cost<br />

3 Parking Off street parking<br />

facilities<br />

1.0% to 1.5% of<br />

the project cost<br />

depending on the<br />

80% of the cost <strong>for</strong><br />

undertaking studies/ surveys/<br />

master plans<br />

126