e avoided. Because U08W and U080 are not discriminated in the depletion calculation, use of only<br />

U080 is recommended. It is <strong>to</strong> be noted that there is no significant effect by chemical binding of UO 2<br />

in usual thermal reac<strong>to</strong>r calculations.<br />

• Plural X-Region specification<br />

When plural X-Regions are specified, one depleting material should not be contained in two<br />

different X-Regions.<br />

• Restart burn-up calculation<br />

The restart burn-up calculation is available as far as members caseHTjj (cf. Sect.3.1) of the<br />

same case name are preserved on MACRO or MACRWRK (no collapsing is done) file. The change of<br />

input data is limited, in principle, only on restart specification and addition of burn-up steps.<br />

Even in the case of abnormal termination due <strong>to</strong> lack of CPU time or shortage of disk extent, if<br />

the members caseHTjj are preserved on MACRO or MACRWRK file, the calculation can be<br />

continued by using this restart option. However, if the virtual PDS file is used, the members are not<br />

s<strong>to</strong>red in the case of some abnormal terminations. To avoid such a trouble in a large-scale burn-up<br />

calculation, it is recommended <strong>to</strong> set IOMODE (access mode of MACRO file) <strong>to</strong> ’File’ (direct file<br />

access) in Block-5 of Sect.2.2.<br />

• Branch-off calculation<br />

The branch-off calculation along the burn-up steps is available if the member caseBNUP of the<br />

reference case is preserved on MACRO or MACROWRK (no collapsing is done) file. The input <strong>for</strong><br />

geometry, number of burn-up steps, burn-up intervals, etc. must be consistent with those of the<br />

reference case. Number of materials, the order of materials (=material number) and the burn-up chain<br />

model must be also kept in principle, whereas material temperatures, composition of non-depleting<br />

materials may be replaced.<br />

For example, when the average cross-sections of the assembly with control rod insertion is<br />

obtained by the branch-off calculation, the region in which the control rod is inserted should be<br />

reserved as an R-Region in the reference calculation without control rod insertion.<br />

If the control rod material contains any nuclide which appears in the burn-up chain model, the<br />

material should be specified as non-depleting by using the option IBC10=1.<br />

As coolant water of PWR containing boron circulates in primary circuit, this material should be<br />

treated as non-depleting. The reference burn-up calculation may treat the condition without boron, and<br />

the branch-off calculation treat the condition with boron. In the latter condition, the coolant containing<br />