28.10.2014 Views

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)<br />

UNCLASSIFIED<br />

DATE:<br />

FEBRUARY 2002<br />

APPROP CODE/BA:<br />

OPAF/ELECTRONICS & TELECOMMUNICATION EQUIPMENT<br />

P-1 NOMENCLATURE:<br />

CHEYENNE MOUNTAIN COMPLEX<br />

FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007<br />

QUANTITY<br />

COST<br />

(in Thousands)<br />

$597 $30,429 $17,588 $15,238 $14,379 $15,808 $15,225<br />

Description:<br />

This program supports acquisition for the Cheyenne Mountain Complex (CMC). Cheyenne Mountain Systems provide real-time ballistic<br />

missile warning, air defense, force management, battle management and command control and communications for the United States Space<br />

Command (USSPACECOM) and North American <strong>Air</strong> Defense (NORAD) missions. The program also provides <strong>Air</strong> <strong>Force</strong> Space Command<br />

(AFSPC) with commmunications and computer equipment in Defense Message System and Base Network Control Center, USSPACECOM<br />

Mobile Consolidated Command Center and the Cheyenne Mountain Training System.<br />

1. COMMANDER-IN-CHIEF (CINC) MOBILE CONSOLIDATED COMMAND CENTERS (MCCCs): The CINC MCCC provides<br />

contingency reconstitution and continuity of command capabilities to accomplish directed CINC missions in the event primary command and<br />

control facilities are incapacitated. FY02/03 funds upgrade the current messaging capability to keep in pace with the required communication<br />

capabilities, replace existing generators with a new power generation structure, upgrade communication systems, and replace mission recovery<br />

equipment. These new capabilities will significantly reduce the platform’s footprint, enhance operations, and provide a source of an<br />

uninterruptable power supply.<br />

2. TACTICAL WARNING/ATTACK ASSESSMENT (TW/AA) INTERFACE NETWORK: No FY 03 funding requested.<br />

3. NORAD CHEYENNE MOUNTAIN COMPLEX-TACTICAL WARNING/ATTACK ASSESSMENT (NCMC-TW/AA) SYSTEMS:<br />

AFSPC approved an update to the Integrated Master Evolutionary Plan (IMEP) to better manage configuration control of legacy mission<br />

systems and manage Integrated Space Command and Control (ISC2) hardware and software migration. The various projects include:<br />

(a) Integrated Space Command and Control (ISC2) Migration: This project delivers ISC2 hardware and associated software to Cheyenne<br />

Mountain operating locations, to include remote interfacing sites essential for support to USSPACECOM and NORAD missions as exercised<br />

P-1 ITEM NO PAGE NO:<br />

41<br />

53<br />

UNCLASSIFIED<br />

Page 1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!