BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)<br />

UNCLASSIFIED<br />

DATE:<br />

FEBRUARY 2002<br />

APPROP CODE/BA:<br />

OPAF/ELECTRONICS & TELECOMMUNICATION EQUIPMENT<br />

P-1 NOMENCLATURE:<br />

CHEYENNE MOUNTAIN COMPLEX<br />

Description (continued):<br />

from the Cheyenne Mountain Operations Center (CMOC) and forward operating locations. ISC2 Migration includes installation and check out<br />

actions for ISC2 components and interfaces within the CMOC, at sensor sites, at forward user sites, and at other command center locations.<br />

FY02 funds procure an application/database server that will be the foundation of the ISC2 Target System enterprise server infrastructure at<br />

Cheyenne Mountain, and will initially support a robust air mission capability with approximately twenty-eight <strong>Air</strong> Mission Evolution (AME)<br />

workstations. FY02 funds also procure client workstations as well as a communications processing system that will process and forward<br />

messages from sensor sites. FY03 funds will add seven additional client workstations at various forward locations. (b) Integrated Test,<br />

Training, and Exercise Facility: This project provides for the planning, delivery, installation, and support of commercial off-the-shelf (COTS)<br />

hardware and associated software which, together with developed and/or integrated software, will provide AFSPC the capability to conduct<br />

system integration and testing as well as operator training and exercises. FY02 funds procure application/data base servers to support AME<br />

integration and testing as well as the migration of additional mission areas to the enterprise infrastructure. FY02 funds also procure<br />

Communications Processing System equipment, to include servers, client workstations, installations and upgrades. (c) Missile Analysis and<br />

Reporting System (MARS): FY02 funds procure this project, which consists of a single architecture that provides both strategic and theater<br />

warning capabilities. The MARS project will deliver enhanced missile warning functionality by providing improved situational awareness,<br />

more timely and accurate assessments and will evolve to provide multi-source data correlation. This integrated approach to achieving a single<br />

integrated missile warning capability will extend from sensor to decision-maker, and will result in great efficiencies in assessments during crisis<br />

operations. MARS will provide a platform to further integrate Space Based Infrared Sensor, Ground-based Midcourse Missile Defense and<br />

other sensors. MARS will insure accuracy of predicted launch and impact points by correlating infrared spatial observation with radar<br />

observations. This DoD data will eliminate repetitive or redundant track reports and event messages, and will be distributed to the users faster<br />

than is currently accomplished today. It also will replace the current Integrated TW/AA Missile Warning System that is past its planned life<br />

cycle. (d) Temporary Command Center: FY03 funds will provide for the planning, engineering design and drawing preparation of the<br />

Temporary Command Center in addition to the coordination of work with CMOC and 721st Support Group staffs. This project will include<br />

preparation of the allocated floor space and equipping the Temporary Command Center with fully functional enterprise workstations and<br />

integrated communications suites for up to 15 personnel. FY04 funds will also provide for initial checkout, testing and certification for<br />

operation of ISC2 equipment, and cut-over of the CMOC mission functions from legacy systems in the current command center to the ISC2<br />

temporary command center in preparation for eventual movement to the Objective Command Center beginning in FY05.<br />

P-1 ITEM NO PAGE NO:<br />

41<br />

54<br />

UNCLASSIFIED<br />