28.10.2014 Views

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)<br />

UNCLASSIFIED<br />

DATE:<br />

FEBRUARY 2002<br />

APPROP CODE/BA:<br />

OPAF/ELECTRONICS & TELECOMMUNICATION EQUIPMENT<br />

P-1 NOMENCLATURE:<br />

SPACELIFT RANGE SYSTEM (SPACE)<br />

Description (continued):<br />

program, using preliminary RMA data to prioritize an extensive backlog of sustainment actions. They included, but were not limited to:<br />

continuing integration and testing of data/communications systems; continuing replacement of command destruct transmitters; replacing analog<br />

processors; and integrating and testing replacement telemetry systems.<br />

The FY02 recapitalization efforts are based on RMA analysis, range operator priorities, and the SLRS architecture. They include, but are not<br />

limited to: replacing optics site computer systems; converting to digital range communications system; modifying command destruct systems to<br />

accommodate frequency changes; replacing down range data switches and radar control systems; replacing video data processing equipment;<br />

replacing command transmitter consoles; and replacing radar/telemetry site computers. Additionally, FY02 funds pay for evaluation and<br />

acceptance testing of SLRSC recapitalization products.<br />

The FY03 recapitalization efforts again will be based on RMA analysis, range operator priorities, and the SLRS architecture. They will include,<br />

but are not limited to: replacing obsolete and unsupportable modems and related data transmission equipment; correcting optical site computer<br />

operational deficiencies; correcting command transmitters tone balance and RF envelope deficiencies; replacing obsolete cyber net terminals;<br />

correcting timing signal deficiencies; replacing unmaintainable and obsolete GPS receivers; replacing obsolete telemetric antenna control units;<br />

improving inadequate and insufficient weather speed and direction sensors; replacing unsupportable and maintenance intensive standard digital<br />

transport systems; replacing obsolete master station sensing computers; providing for integration of range safety data plotters; providing relief of<br />

saturated fiber cables; upgrading count distribution systems to allow interface with digital formats; and replacing high failure graphic<br />

workstations. Additionally, FY03 funds will pay for evaluation and acceptance testing and ISS, to include initial spares, support services, and<br />

collection of reprocurement data.<br />

P-1 ITEM NO PAGE NO:<br />

59<br />

167<br />

UNCLASSIFIED<br />

Page 4 of 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!