28.10.2014 Views

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)<br />

UNCLASSIFIED<br />

DATE:<br />

FEBRUARY 2002<br />

APPROP CODE/BA:<br />

OPAF/ELECTRONICS & TELECOMMUNICATION EQUIPMENT<br />

P-1 NOMENCLATURE:<br />

COMM ELECT MODS<br />

Description (continued):<br />

optical telescopes analyze and report solar flare activity.<br />

(5) MOD# N/A, Miscellaneous Low Cost Mods: No FY03 funding requested.<br />

6. JOINT SURVEILLANCE SYSTEM (JSS): The JSS is a combined USAF/Federal Aviation Administration (FAA) network providing air<br />

surveillance data through a distributed network of radars around the perimeter of the continental US, Alaska, Hawaii, and Puerto Rico. The<br />

surveillance data also directly supports CINCNORAD’s Atmospheric Tactical Warning and Attack Assessment (ATW/AA) mission as well as<br />

air traffic control missions of the FAA and other multi-national air traffic control agencies. FY02/03 funds will replace FPS-117 Long Range<br />

Radar interrogator set beacons and environmental control units throughout the network. These components have become logistically<br />

unsupportable in their current configurations.<br />

7. NORTH WARNING SYSTEM (NWS): The NWS is a combined US/Canadian effort providing surveillance and ITW/AA coverage of<br />

northern approaches to the US and Canada as part of the Atmospheric Early Warning System. The radar interrogator set beacons, the<br />

Environmental control units (ECU) are at the end of their useful life, and suffer from reliability and supportability problems. The beacon is no<br />

longer in production and replacement parts are virtually exhausted. The ECU provides heating and coolling to radar components; however, the<br />

units are leaking refrigerant into the atmosphere. Loss of either the beacon or ECU will cause the radar to shut down and make it impossible for<br />

NORAD to accomplish its air defense mission. FY02/03 funds begin this reliability/sustainability modification by replacing the radar<br />

interrogator set beacons and ECUs to prevent any gaps in the North American Defense System.<br />

8. SHARED EARLY WARNING SYSTEM (SEWS): FY02 funds procure upgrades to SEWS-specific equipment at theater CINCs, partner<br />

nations, and the Centralized Distribution Facility (CDF) at Peterson AFB, Colorado Springs, CO. FY03 funds will procure equipment upgrades<br />

at SEWS Inject Sites in the Pacific Command (PACOM) and European Command (EUCOM) theaters of operation. FY03 funds will also<br />

continue equipment upgrades for the CDF, where data is initially received, filtered, and then transmitted to SEWS customers.<br />

P-1 ITEM NO PAGE NO:<br />

70<br />

223<br />

UNCLASSIFIED<br />

Page 8 of 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!