BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)<br />

UNCLASSIFIED<br />

DATE:<br />

FEBRUARY 2002<br />

APPROP CODE/BA:<br />

OPAF/ELECTRONICS & TELECOMMUNICATION EQUIPMENT<br />

P-1 NOMENCLATURE:<br />

COMM ELECT MODS<br />

Description (continued):<br />

A. AN/GRN-30 Instrument Landing System (ILS) Antenna/Distribution Unit: The GRN-30 ILS antennas, antenna distribution unit, and<br />

monitor combining unit are becoming logistically unsupportable. The antenna distribution units have been rebuilt numerous times and provide<br />

an unstable and erratic output. Many of the distribution units in the field are out of technical order specification but remain in service because<br />

replacements are not available or rebuilt ones are more out of tolerance than the ones in the system. The integral detectors in the monitor<br />

combining unit have been the single high failure part of the ILS system for years. FY01-03 funds procure this modification, which increases ILS<br />

operational availability, reducing risk that aircraft will be required to divert to other bases or attempt landings at night and/or in hazardous<br />

weather conditions without landing assistance, and ensures expeditious recovery of combat/training sorties.<br />

B. AN/TRN-41 TECHNICAL UPGRADE: Existing equipment design and construction is of 1970s technology, and contains obsolete<br />

components that can no longer be procured. This equipment is projected to be the only deployable TACAN in the <strong>Air</strong> <strong>Force</strong> inventory;<br />

this modification will extend the service life of the system. In addition, existing tripods will not support long term deployments and must be<br />

replaced.<br />

C. AN/TPN-19, Landing Control Central (LCC) RESHELTER: Two systems have been re-sheltered, two are in progress. This re-sheltering<br />

is necessary due to compromise of existing shelter integrity and environmental control. A common ISO shelter is used and all hardware is<br />

re-sheltered.<br />

D. MISCELLANEOUS LOW COST MODIFICATIONS: FY01-03 funding procures/installs a variety of operations-related modifications,<br />

which include, but are not limited to, the following: (1) Improve sustainability of line replaceable units (LRU) and provide replacement of<br />

unsupportable power supplies on the AN/TPN-19. (2) Modification of the mobilizer on the AN/TPN-19 to meet the tow requirements of 17,000<br />

pounds minimum to 20,000 pounds maximum (3) Flight Data Input/Output modification necessary for USAF locations to connect to the FAA<br />

<strong>Air</strong> Route Terminal Control Centers. The Federal Aviation Administration is currently upgrading the displays, printers, and keyboards. (4)<br />

Replacement of the current Automatic Terminal Information Service (ATIS) due to parts obsolescence. Parts for the ATIS are no longer<br />

available for procurement, and the cost to reverse engineer would exceed the unit acquisition cost tenfold. (5) Procure a phase control unit, for<br />

the AN/GPN-12/20, which can be attached directly onto the drive motor to adjust the input phase and the rotation speed of the antenna. (6) The<br />

P-1 ITEM NO PAGE NO:<br />

70<br />

219<br />

UNCLASSIFIED<br />

Page 4 of 8