28.10.2014 Views

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WEAPON SYSTEM COST ANALYSIS (EXHIBIT P- 5)<br />

UNCLASSIFIED<br />

DATE:<br />

FEBRUARY 2002<br />

APPROP CODE/BA:<br />

OPAF/OTHER BASE MAINTENANCE & SUPPORT EQUIPMENT<br />

P-1 NOMENCLATURE:<br />

AIR BASE OPERABILITY<br />

WEAPON SYSTEM<br />

COST ELEMENTS<br />

FY2001 FY2002 FY2003<br />

IDENT<br />

CODE QTY<br />

UNIT TOTAL<br />

UNIT<br />

QTY<br />

TOTAL<br />

UNIT<br />

QTY<br />

TOTAL<br />

QTY UNIT<br />

COST COST<br />

COST COST<br />

COST COST<br />

COST<br />

A. ARTS {854} {2,859} {1,686}<br />

ARTS HARDWARE A 3 190,333 571 6 195,000 1,170 7 205,000 1,435<br />

INTERIM CONTRACTOR SUPPORT (ICS) 90 270<br />

CRITICAL ITEM SETS (1) 1 92,000 92 4 72,000 288<br />

ENGINEERING CHANGE ORDERS 101 1,131 251<br />

TOTAL<br />

COST<br />

B. ARTS ATTACHMENTS/EOD SUPPORT<br />

{2,067} {3,083} {4,014}<br />

EQUIPMENT<br />

90MM WATER CANNON A 10 10,000 100<br />

RECOILLESS, MULTIDIRECTIONAL WATER A 21 25,500 536<br />

CANNON MOUNT<br />

ARTS ALTERNATE CONTROL SYSTEM A 21 45,500 956<br />

RONS A 19 108,789 2,067 28 106,525 2,983 3 183,333 550<br />

RONS ARS SYSTEM UPGRADE A 81 12,000 972<br />

MK-VI ROBOTS A 8 125,000 1,000<br />

TOTALS: 2,921 5,942 5,700<br />

REMARKS:<br />

1. CRITICAL ITEM SETS CONSIST OF A CENTRAL PROCESSOR UNIT, FIXED CAMERA ASSEMBLY, ANTENNA SET, OPERATOR CONTROL<br />

STATION, AND BACKHOE ACTUATOR CONTROL NODE.<br />

P-1 ITEM NO PAGE NO:<br />

83<br />

58<br />

UNCLASSIFIED<br />

Page 1 of 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!