28.10.2014 Views

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)<br />

APPROP CODE/BA:<br />

OPAF/VEHICULAR EQUIPMENT<br />

UNCLASSIFIED<br />

P-1 NOMENCLATURE:<br />

TUNNER LOADER<br />

DATE:<br />

FEBRUARY 2002<br />

QUANTITY<br />

COST<br />

(in Thousands)<br />

FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007<br />

47<br />

$96,056<br />

44<br />

$90,132<br />

38<br />

$84,329<br />

Description:<br />

The Tunner <strong>Air</strong>craft Loader replaces the current 463L Material Handling Equipment (MHE) 40K <strong>Air</strong>craft Loaders, Lower Lobe <strong>Air</strong>craft<br />

Loaders, and Wide Body Elevator Loaders (WBEL). The Tunner is becoming the most critical asset of the strategic airlift MHE fleet by virtue<br />

of its capacity and rapid on/off load capability for strategic airlift including Civil Reserve <strong>Air</strong> Fleet (CRAF) aircraft. The Tunner expeditiously<br />

handles all configurations of air cargo. Manufactured by Systems and Electronics, Inc., St. Louis, Mo., it accommodates six pallets and carries a<br />

maximum of 30 tons to a height of 18.5 feet. It interfaces with all military and CRAF cargo aircraft and meets nuclear material handling safety<br />

criteria and certification. The Tunner is drive-on/drive-off and air transportable on C-141, C-5, and C-17 aircraft. It has reduced B-747 aircraft<br />

load times by 50 percent, reduced Wide Body Elevator deployment by nearly 50 percent and achieved a 100 percent mission effectiveness rate<br />

during Operation DESERT FOX. In addition, 27 Tunners successfully supported Operations ALLIED FORCE and SHINING HOPE. This<br />

budget request sustains efficient production. Programmed funding provides the total Tunner inventory objective of 318.<br />

Due to an administrative error, a reduction was applied to the equipment line instead of the spares line. A below threshold reprogramming of<br />

$6.337M will be accomplished in execution to permit both the acquisition of 38 loaders and required support for the fleet.<br />

Identification Code: A<br />

0<br />

$0<br />

0<br />

$0<br />

0<br />

$0<br />

0<br />

$0<br />

P-1 ITEM NO PAGE NO:<br />

24<br />

68<br />

UNCLASSIFIED<br />

Page 1 of 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!