28.10.2014 Views

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)<br />

UNCLASSIFIED<br />

DATE:<br />

FEBRUARY 2002<br />

APPROP CODE/BA:<br />

OPAF/ELECTRONICS & TELECOMMUNICATION EQUIPMENT<br />

P-1 NOMENCLATURE:<br />

C3 COUNTERMEASURES<br />

Description (continued):<br />

capability, are replaced approximately every three years. Computer hardware hosting the JQUAD training simulation system at training centers<br />

worldwide must be replaced with computer systems compatible with the JSIMS architecture. Funding also provides for deployable field support<br />

systems, equipment, and training for detecting, identifying, locating, targeting, exploiting and countering signals in support of combatant<br />

commanders, national agencies, exercises, and advanced concept technology of demonstrations (ACTD) vulnerability assessments.<br />

a. ELECTRONIC COMBAT (EC) ANALYST NETWORK: FY01-03 funding provides continuing upgrades to multi-processor<br />

systems to improve performance and achieve interoperability with virtual simulations. Additional processors and storage capacity must be<br />

added to the JIOC analysis networks and systems to improve performance of IO computer models.<br />

b. COMBAT ANALYSIS SYSTEM: FY01-03 funding provides field commander support systems including, automated support<br />

systems for IO training.<br />

c. FIELD COMMANDERS SUPPORT: FY01-03 funding provides for workstations, which deploy with CINC support teams and<br />

provide on-scene analytical support as well as reach-back capability (replaced every three years).<br />

d. COMPUTER TRAINING SIMULATION: FY01-03 funding provides for computer hardware, which hosts the JQUAD training<br />

simulation system at training centers worldwide, and must be replaced with computer systems, which are compatible with the JSIMS<br />

architecture.<br />

e. IO RED TEAM SUPPORT: FY01-03 funding provides for deployable field support systems, equipment, and training for<br />

detecting, identifying, locating, targeting, exploiting and signals in support of combatant commanders, national agencies, exercises, and<br />

Advanced Concept Technology Demonstrations (ACTD) vulnerability assessments.<br />

A reduction or loss in funding would severely hamper support to joint force, service, and functional component commanders in C2W/IO<br />

support. Specifically, the lack of funding would result in the following: (1) Inability to replace computer systems to host training simulations in<br />

gaming centers worldwide (2) Extremely limited upgrades to multi-processor which would degrade performance and significantly delay<br />

P-1 ITEM NO PAGE NO:<br />

50<br />

120<br />

UNCLASSIFIED<br />

Page 5 of 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!