28.10.2014 Views

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

unclassified - Air Force Financial Management & Comptroller

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BUDGET ITEM JUSTIFICATION (EXHIBIT P-40)<br />

UNCLASSIFIED<br />

DATE:<br />

FEBRUARY 2002<br />

APPROP CODE/BA:<br />

OPAF/ELECTRONICS & TELECOMMUNICATION EQUIPMENT<br />

P-1 NOMENCLATURE:<br />

SPACELIFT RANGE SYSTEM (SPACE)<br />

FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007<br />

QUANTITY<br />

COST<br />

(in Thousands)<br />

$95,031 $131,841 $108,281 $152,558 $182,204 $172,876 $181,173<br />

Description:<br />

The Eastern Range (ER), at Patrick AFB, FL, and the Western Range (WR), at Vandenberg AFB (VAFB), CA, are the nation’s primary<br />

Spacelift Ranges. They provide tracking, telemetry, control, communications, flight analysis, and other capabilities necessary to safely conduct<br />

national security, civil, and commercial spacelift operations; intercontinental and sea-launched ballistic missile evaluations: and aeronautical<br />

and guided weapons tests. Many of the range assets are outdated, unreliable, inefficient, and costly to operate and maintain.<br />

The <strong>Air</strong> <strong>Force</strong> (AF) is addressing range shortcomings through modernization and recapitalization efforts under the Spacelift Range System<br />

(SLRS) program. Modernization meets documented requirements for a standardized and automated spacelift range system to support the<br />

evolving launch mission. Recapitalization replaces deficient, obsolete, and difficult to sustain equipment with more efficient and reliable<br />

equipment. Together, these efforts will improve range responsiveness to launch demands, reduce operations and maintenance costs, enhance<br />

range safety, and standardize logistics support. Funding for the associated RDT&E efforts is in Budget Activity 7, Operational Systems<br />

Development, PE 35182F, Project 674137.<br />

The AF is implementing range modernization and recapitalization through two related programs. First, the Range Standardization and<br />

Automation (RSA) Phase IIA program modernizes the control/display and communication segments of the ranges. Second, the Spacelift Range<br />

System Contract (SLRSC) modernizes the instrumentation segment of the ranges, and engineers and executes a proactive recapitalization<br />

process to replace hardware no longer efficient and sustainable. Following are details of the FY01-03 program:<br />

P-1 ITEM NO PAGE NO:<br />

59<br />

164<br />

UNCLASSIFIED<br />

Page 1 of 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!