detailed explanation for each SIC code - Biffa
detailed explanation for each SIC code - Biffa
detailed explanation for each SIC code - Biffa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Explanatory Notes<br />
UK Standard Industrial Classification of Economic Activities 2007 – <strong>SIC</strong>(2007)<br />
43.3 Building completion and finishing<br />
43.31 Plastering<br />
This class includes:<br />
–<br />
application in buildings or other construction projects of interior and exterior plaster or stucco, including related lathing<br />
materials<br />
43.32 Joinery installation<br />
This class includes:<br />
F<br />
–<br />
–<br />
–<br />
installation of doors (except automated and revolving), windows, door and window frames, of wood or other materials<br />
installation of fitted kitchens, built-in cupboards, staircases, shop fittings and the like<br />
interior completion such as ceilings, movable partitions, etc.<br />
This class excludes:<br />
–<br />
installation of automated and revolving doors, see 43.29<br />
43.33 Floor and wall covering<br />
This class includes:<br />
–<br />
laying, tiling, hanging or fitting in buildings or other construction projects of:<br />
■ ceramic, concrete or cut stone wall or floor tiles, ceramic stove fitting<br />
■ parquet and other wooden floor coverings, wooden wall coverings<br />
■ carpets and linoleum floor coverings, including of rubber or plastic<br />
■ terrazzo, marble, granite or slate floor or wall coverings<br />
■ wallpaper<br />
43.34 Painting and glazing<br />
43.34/1 Painting<br />
This subclass includes:<br />
–<br />
–<br />
interior and exterior painting of buildings<br />
painting of civil engineering structures<br />
43.34/2 Glazing<br />
This subclass includes:<br />
–<br />
installation of glass, mirrors, etc.<br />
This subclass excludes:<br />
–<br />
installation of glazed window units and installation of unglazed window frames, see 43.32<br />
43.39 Other building completion and finishing<br />
This class includes:<br />
–<br />
–<br />
cleaning of new buildings after construction<br />
other building completion and finishing work n.e.c.<br />
This class excludes:<br />
–<br />
–<br />
–<br />
activities of interior decoration designers, see 74.10<br />
general interior cleaning of buildings and other structures, see 81.21<br />
specialised interior and exterior cleaning of buildings, see 81.22<br />
43.9 Other specialised construction activities<br />
43.91 Roofing activities<br />
This class includes:<br />
–<br />
–<br />
erection of roofs<br />
roof covering<br />
This class excludes:<br />
–<br />
renting of construction machinery and equipment without operator, see 77.32<br />
43.99 Other specialised construction activities n.e.c.<br />
154