14.11.2014 Views

AR 215-1 - Soldier Support Institute - U.S. Army

AR 215-1 - Soldier Support Institute - U.S. Army

AR 215-1 - Soldier Support Institute - U.S. Army

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

manager is assigned, the garrison commander or Director, FMWR will appoint a copyright control officer to carry out<br />

copyright clearance functions.<br />

H–2. Forms<br />

Clearances will be requested on DA Form 3238. Requirements for additional performances are cleared rapidly, thereby<br />

avoiding the time and more complex efforts involved in cancellation procedures. Requests for additional performances<br />

are coordinated by telephone or in writing with FMWRC as soon as the additional requirements become known.<br />

H–3. Clearance procedures<br />

a. As an attachment to DA Form 3238, section 8 clearly identifies production materials on the clearance request.<br />

Information specifying the length of time required, the date requested, and whether the materials are rented or<br />

purchased will be included. The local duplication, alteration, adaptation, revision, or rearrangement of copyrighted<br />

materials is not authorized except at the specific direction of the leasing agent.<br />

b. Requests for copyright clearances and related correspondence will be sent directly to FMWRC.<br />

c. Direct communication between installations and leasing agents, trustees, or copyright owners is not authorized,<br />

except at the specific direction of FMWRC.<br />

d. If producing organizations, members of performing or producing groups, or any other installation program are<br />

contacted directly by civilian leasing agencies, except for the delivery of production materials, the entertainment<br />

program manager will forward the correspondence, with a proposed reply where appropriate, to FMWRC.<br />

e. All correspondence relating to the availability of copyrighted works will be forwarded to FMWRC.<br />

f. Requests for perusal copies may be made directly with the leasing agencies, but all costs associated with the<br />

request will be the responsibility of the requesting program. Failure to pay any associated costs may result in denial of<br />

copyright clearance and royalty requests. FMWRC will pay for and coordinate any perusal request that is submitted<br />

and coordinated through FMWRC.<br />

g. Clearance requests (DA Form 3238 and attachments) will be transmitted by facsimile or electronic mail. Copies<br />

of clearance requests will be mailed to FMWRC at the address in paragraph H–8.<br />

H–4. Production materials procedures<br />

a. Upon receipt of production materials, the recipient will conduct a complete inventory, checking against the<br />

packing slip and noting any discrepancies. In the event of a discrepancy, copies of the inventory and enclosed invoices<br />

for materials or scripts, identifying the scripts by title, will be forwarded immediately to FMWRC.<br />

b. Immediately upon completion of use of all production materials, all copyrights control officers will return<br />

materials directly to the leasing agency. The sender will retain mailing or shipping receipts, indicating items returned.<br />

The installation will be liable for any additional costs if materials are returned late, damaged, marked, or lost.<br />

Installations will send to FMWRC a check payable to the leasing agency for invoice costs of the damaged, late, or lost<br />

materials. Disputes are referred to FMWRC for resolution with the leasing agency. Failure to pay damage/late/lost fees<br />

may result in suspension of all other copyright clearances affecting the installation.<br />

H–5. Postponement and cancellation procedures<br />

a. If a scheduled performance is postponed, written notification will be provided to FMWRC before the originally<br />

scheduled performance date. If postponement exceeds 3 months, the clearance will be canceled and a new clearance<br />

request will be submitted for any subsequent production.<br />

b. Installations will provide FMWRC with written notification of cancellations as soon as possible. If some, but not<br />

all, of the cleared performances are canceled, cancellation notices will be provided before the final performance report<br />

is submitted. When an entire production is canceled, a cancellation notice will be provided immediately (especially in<br />

the case of musicals) to avoid unnecessary rental fees. Any production materials will be returned immediately to the<br />

leasing agency.<br />

H–6. Payment procedures<br />

a. Within 5 duty days of the final performance of a copyrighted work, the installation will complete the final part of<br />

DA Form 3238 verifying completed performances and will forward the form to FMWRC. This constitutes the<br />

confirmation of receipt of services/goods and is the basis for authorizing the royalty and fees payment.<br />

b. FMWRC will pay royalties and related fees for works produced by activities of the <strong>Army</strong> Entertainment Program<br />

worldwide. Royalties and related fees for works produced by schools, installation clubs, chapels, and other programs<br />

will be paid by the installation or program on the basis of an invoice from FMWRC. The check will be made payable<br />

to the leasing agency but will be sent to FMWRC for verification and forwarding.<br />

c. If a leasing agency sends an invoice for royalties and rental fees directly to the installation, it will be forwarded<br />

immediately to FMWRC.<br />

<strong>AR</strong> <strong>215</strong>–1 • 31 July 2007<br />

201

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!