- Page 1 and 2:
Uniclass L5171 CI/SfB (53) In6 E271
- Page 3 and 4:
Contents Introduction to Hepworth 2
- Page 5 and 6:
The Hep 2 O ® System Introduction
- Page 7 and 8:
Retaining Cap Grab Wedge Wedge Supp
- Page 9 and 10:
Typical Plumbing Connections Wash h
- Page 11 and 12:
Performance Benefits No Scale Build
- Page 13 and 14:
Stopcock - Cold Water, Hep 2 O ® /
- Page 15 and 16:
Hep 2 O ® Pipes Cut Lengths - Stan
- Page 17 and 18:
Hep 2 O ® Demountable Fittings Dou
- Page 19 and 20:
Hep 2 O ® Demountable Fittings Bra
- Page 21 and 22:
Hep 2 O ® SlimLine Fittings Straig
- Page 23 and 24:
Hep 2 O ® SlimLine Fittings Branch
- Page 25 and 26:
Hep 2 O ® Auxiliary Fittings Adapt
- Page 27 and 28:
Hep 2 O ® Auxiliary Fittings Wall
- Page 29 and 30:
Hep 2 O ® Auxiliary Fittings Shut-
- Page 31 and 32:
Hep 2 O ® Auxiliary Fittings Two P
- Page 33 and 34:
Hep 2 O ® Auxiliary Fittings Radia
- Page 35 and 36:
Hep 2 O ® Ancillary Items Pipe Cli
- Page 37 and 38:
Hep 2 O ® Ancillary Items Copper P
- Page 39 and 40:
Hep 2 O ® Conduit System Conduit T
- Page 41 and 42:
Hep 2 O ® Accessories Hep 2 O ® C
- Page 43 and 44:
Hep 2 O ® Performance Data Strengt
- Page 45 and 46:
Thermal Characteristics Thermal con
- Page 47 and 48:
Electrical Safety Hep 2 O ® piping
- Page 49 and 50:
Connection to Compression Fittings
- Page 51 and 52:
Connection to Steel Pipes and Threa
- Page 53 and 54: Connection to Boilers and Heaters W
- Page 55 and 56: Hep 2 O ® Design Considerations In
- Page 57 and 58: Typical Domestic Plumbing Arrangeme
- Page 59 and 60: Introduction Underfloor heating pro
- Page 61 and 62: System Sizing For pipe sizing Hep 2
- Page 63 and 64: 100.0 28mm 80.0 60.0 50.0 40.0 30.0
- Page 65 and 66: 50.0 28mm 40.0 30.0 20.0 3.0 2.0 1.
- Page 67 and 68: Parameters for Drilling Through Tra
- Page 69 and 70: Hep 2 O ® Manifolds and Microbore
- Page 71 and 72: Pipes in Concealed Locations Hep 2
- Page 73 and 74: Hep 2 O ® Design Considerations Co
- Page 75 and 76: Domestic Timber Floors With Traditi
- Page 77 and 78: To facilitate the possible removal
- Page 79 and 80: Conduit terminations at wall surfac
- Page 81 and 82: 2. Fix each conduit pipe to noggins
- Page 83 and 84: Hep 2 O ® Design Considerations Re
- Page 85 and 86: Use of Corrosion Inhibitors Corrosi
- Page 87 and 88: A Flexible Answer for Prestige Apar
- Page 89 and 90: As an alternative to separate Barri
- Page 91 and 92: Valves • Valve types shall have a
- Page 93 and 94: Hep 2 O ® Precautionary Advice Tro
- Page 95 and 96: Raw material sourcing The mining of
- Page 97 and 98: Hep 2 O ® International Standards
- Page 99 and 100: Drylined walls and Hep 2 O ® 80 Du
- Page 101 and 102: Straight connector Demountable 14 S