Hep 2<br />

O ® Specification Clauses<br />

Project Location.....................................<br />

Drawing References.................................<br />

Main Contract Preliminaries.................................<br />

(Insert as appropriate)<br />

General System Performance<br />

Requirements<br />

1. Cold water installation..............................<br />

2. Hot water installation.................................<br />

3. Low temperature hot water space heating<br />

installation (exposed heat emitters)............................<br />

4. Underfloor heating installation<br />

Shall be Hep 2 O ® UFH Manifold System.<br />

(Brief descriptions of installations 1 to 4 where appropriate)<br />

Associated general building work<br />

(Refurbishment and/or direct plumbing contract)<br />

For example: form openings, chases, duct casings, etc<br />

where appropriate.<br />

Associated electrical work<br />

EITHER<br />

(Use the following clause when electrical work is carried<br />

out by a separate contractor)<br />

•<br />

Electrical work in connection with the plumbing<br />

installation is to be in accordance with electrical<br />

specification and carried out by the electrical engineer.<br />

OR<br />

(Use the following clause when electrical work is specific<br />

to the plumbing contract only)<br />

•<br />

Electrical work to be included as part of the plumbing<br />

contractor’s work, and carried out in accordance with<br />

BS 7671 “ Requirements for Electrical Installations”<br />

- The IEE Wiring Regulations.<br />

Design of installations<br />

EITHER<br />

(Use the following clauses where contractor designs<br />

installation. Also delete* as required)<br />

•<br />

The (Main)* (Plumbing)* Contractor is to be<br />

responsible for the design and installation of the<br />

Hep 2 O ® systems (1 to 4 below as appropriate) in<br />

accordance with Hepworth Building Products<br />

instructions, all relevant statutory requirements,<br />

standards or codes of practice.<br />

1. Pipeline sizes shall:<br />

a) Meet anticipated simultaneous water demand for<br />

the building type<br />

b) Provide a water velocity of 2 m/s for cold water,<br />

1.3 m/s for hot water<br />

c) Provide a minimum discharge rate at each draw-off<br />

point (refer to schedule taken from BS 6700)<br />

d) Ensure a cold water storage cistern filling time of<br />

not more than.......hour(s).<br />

2. Hot water storage system shall ensure the:<br />

a) Storage capacity is sufficient for the building type<br />

b) Primary heat source is capable of raising the water<br />

temperature from 10ºC to 60ºC in 1 hour<br />

c) Temperature of stored hot water is 60ºC to 65ºC.<br />

3. Low temperature hot water space heating system<br />

shall ensure:<br />

a) Exposed heat emitters maintain the required room<br />

temperatures<br />

b) Surface temperature of heat emitters is not<br />

greater than.....ºC.<br />

4. Hep 2 O ® UFH Manifold System shall be installed in<br />

accordance with Hepworth Plumbing Products’<br />

recommendations.<br />

OR<br />

(Use the following clauses where the plumbing<br />

contractor is not to design the plumbing system)<br />

•<br />

Pipe sizes to be installed as shown on the drawings<br />

and performance schedules/tables.<br />

•<br />

The cold water stoage cistern filling time in houses<br />

up to three bedrooms shall not exceed one hour.<br />

Hep 2 O ® Pipes and Fittings<br />

Pipes for cold and hot water<br />

• Shall be Hep 2 O® Standard Straight Coiled Pipe,<br />

Code.......... and/or<br />

• Shall be Hep 2 O® Standard Cut Length, Code..........<br />

Pipes for central heating<br />

• Shall be Hep 2 O® Barrier Straight Coiled Pipe,<br />

Code.......... and/or<br />

• Shall be Hep 2 O® Barrier Cut Length, Code..........<br />

Conduited pipes for central heating<br />

• Shall be Hep 2 O® Barrier Straight Coiled Pipe,<br />

Code.......... and/or<br />

• Shall be Hep 2 O® Barrier Cut Length, Code..........<br />

• Shall be Hep 2 O® Conduit System comprising:<br />

Conduit Pipe, Code.........<br />

Conduit Junction Box and Lid, Code.........<br />

and if required<br />

Terminal Back Plate, Code HX103<br />